Outhouses in American photographs: Victorian Age – early 20th Century including FSA Lee Russell, Carl Mydans, Walker Evans (excerpt 2)

Per reader request, over the next few days I’ll be reposting mini chapter excerpts — primarily illustrations– from a longer read about the evolution of outhouses and public utilities specific to Gloucester, Massachusetts, Privy to Privy History, on Good Morning Gloucester June 6, 2021.

Catherine Ryan, Aug. 2021

Gloucester housing stock (and hotels) included luxury homes with bathrooms and water closets as well as modest solutions. Rough outhouses were common, too. Can you spot the outhouses downtown and in East Gloucester?

(Reminder about the photographs: you can pinch and zoom to enlarge and right click for descriptions. Some media offer the option to “increase file size”.)

 

Then (below the garden) | Now

Gloucester – Victorian Age outhouses

1930 – 1941 American outhouses – cross county photos

photographs outhouses across America – Library of Congress

  • Cincinnati row houses with backyard outhouses, 1930s
  • privy plant pre cast base, Missouri, by Lee Russell, 1938
  • Placing concrete in form for privy slab, MN, by Shipman, 1941, Library of Congress (collection FSA Office of War Info)
  • South family’s shaker style privy, Harvard, Worcester County, MA 1930s
  • General Israel Putnam Privy, Brooklyn, CT after storm
  • Arlington, MA, Walker Evans 1930s
  • Privy Monterey, Delaware, circa 847
  • Washington DC “slum” privy, Carl Mydans, 1935
  • “old six hole privy, Wiggins Tavern”, Northampton, MA, Lee Russell, 1939

photographs Indoor bathrooms residential and public – New York Public Library

 

Cincinnati backyard outhouses

 

 

Rain delays don’t stop sewer projects! Last time Bertoni, York and Foley Roads done, Rt. 128 was coming in. See the original plans ca.1950 #PublicWorks #GloucesterMA DPW

With thanks to Mike Hale, Dir. Public Works; Matt Coutu, Civil Engineer with New England Civil Engineering thru DPW; and Police Sergeant Conners.

At this time in July, Gloucester Public Works is generally midway into a construction season. Not this year. The rain has caused a “knotted web of deficiencies,” impacting routine work such as patching and pothole repair, outside painting, line & crosswalk painting, and summer paving which is “weeks and weeks behind”. Mowing wet grass or while it’s raining isn’t a good idea. And when the sun comes out the grass takes off. So that’s a visible delay. Still, DPW is plugging away at smaller projects around town, at the waste water plant, and pumping station projects. Most Utility work is on schedule.

Even before all this rain, the 2021 schedule demanded flexibility. DPW projects are unseen in the best of times, and can go unrecognized. Gloucester DPW worked through the pandemic. People forget that they were essential services. Prioritizing projects has been key (think critical events as in hazards or special events downtown). Also pacing and flexibility:

“The past 18 months have been taxing on these guys. Mistaken belief still out there that everyone had quarantine off. They need vacation this year. Didn’t get it last year. I’m mindful of burnout. So at times we’ll be short. Could be a specialty, supervisory, labor or machine operator job. They’re all important. The edges may be where you start assembling puzzle pieces, but you’re still going to need the outside and center pieces to be complete.”

Mike Hale, Dir. Public Works, July 2021 addressing holes if any in DPW operation

Essential workers, dangerous jobs – lest we forget | TRENCH BOXES — akin to mine shaft collapse prevention — for utilities and road work

Bertoni neighborhood water & sewer project 2021

Gas, sewer, and water lines have all been removed, redirected and replaced. Clay tile pipe (sewer) is notorious for ground water intrusion, and cast iron (water) for tuberculation*– New PVC will increase run time and water quality.

  • I had to ask. *TUBERCULATION: “Accumulation of minerals inside pipe decreases volume and impacts water quality.”

DPW is pumped about the new pump!

The former configuration ran beneath Rt. 128. Now that it’s been re-directed and running to a newer location off Poplar/DPW campus, there will be a significant savings both for the life of the pump and electricity.

“The Gloucester Ave. sewer pump station, during wet weather and high ground water, would run in excess of 12 hours per day, some days even longer. Running time for the newer one has been cut down to 6 hours a day.”

Mike Hale

Looking Back – February 1947

The Gloucester 2.5 mile highway construction was delayed “indefinitely”, because the bids for the approach (to a new bridge across Annisquam River) came in too high. The lowest bid was $1,285,776 and the cost was fixed at $300-$500,000.

August 1950

“…Much to the joy of thousands of beleaguered year-round and Summer residents, it was announced that the gap in the new high level bridge over Annisquam River was closed at 9a.m. by Bethlehem Steel Corporation.

The great significance was that it meant that it will not be too long before auto traffic will be flowing over this this improved entrance and exit to Gloucester, eliminating the two mile long traffic jams that have brought despair to motorists caught in the frequent openings of the low level Richard Blynman Bridge over the same river.

A sense of joy and relief was also experienced by the two Bethlehem officials in charge of the superstructure contract–Construction Engineers John P. McGonigle and Charles L. “Lonnie” Stroble. For as the 52-foot long, 44 ton piece of steel known as the central arch rib, south side, was lowered into place, their worry was whether or not it would fit. It did. 100 percent… The entire bridge is 860 feet long…

The superstructure contract, let by the State Department of Public Works to Bethlehem Steel is for $1,232,479.90.”

Boston Globe, Aug. 1950

1958 – RT. 128 Construction

Boston Globe focus on Rt. 128 by K. S. Bartlett features Gloucester, Ma.

“Approximately $1 million a mile for 65 miles of the great three-quarter circle from Gloucester on the North Shore to the high speed interchange in Braintree where it will meet the Southeast Expressway coming south from Boston. Cost of the 65 miles, all competed or now under construction, is a bit less than $65 million. That covers land damages, engineering, planning and construction costs since Route 128’s start back in 1936.”

“Rt. 128 has earned name, “Avenue of Modern Industry”: Million Dollar a Mile Gold Road” by K.S. Bartlett, Boston Globe

photo descriptions:

“Contractors building the 1.7 miles of the Gloucester extension found huge rocks dropped by visiting glaciers tens of thousands of years ago. More than half a million tons of rock (many kinds and varieties of hardness and weight) plus earth and plain dirt have been taken out to make your driving easier. Her you’re looking at one of the tough spots during the last weeks of construction.”

“Want a bit of New England’s famed chowder? You’re at the right place. The Gloucester extension of Route 128 ends at Eastern Avenue in Gloucester and just around the corner is Fish-Pier at the head of the Inner Harbor.”

The approach to the bridge they dubbed “Rail Cut Hill”.

Original plans pre 1953, 1953, & 1954

Some of the homes date from this time. Department of Public Works, Gloucester, MA. Higher resolution PDF here – or lower resolution images below

ca. 1950 (scan from original)

1953

1954

2021 Bertoni neighborhood

Approximately 3 months project nearing completion (thanks to digging into standard clay rather than granite ledge). This week, the crews have reached the storm water drain reconfiguration stage.

View from Bertoni Rd. to RT. 128. Old clay sewer line deliberately closed 2021. Bertoni Rd. is a dead end street that originally connected to Gloucester Avenue (on the other side of the highway)

Salt Island Road | Brier (Briar) Neck neighborhood

In contrast, Salt Island Road, Brier/Briar Neck neighborhood took six months for similar work because of granite ledge and compact density.

Privy to privy history: Digging outhouses! GMG reader asks what did people on Cape Ann do back in the day? p.s. Art was flush with it #GloucesterMA

A GMG reader describes area residents as “those on Cape Ann”*, compliments Joey and Good Morning Gloucester, and asks about outhouses:

“Hello Joe, nice to meet ya. I have a Cape Ann question that is a bit strange. When I was younger I used to go on digs to find old bottles on Cape Ann. Recently I saw an article that said in the days of outhouses people would throw their bottles down the hole in their outhouses. I began thinking where on my parents’ property an outhouse might have been located. Then it occurred to me: there isn’t anyplace on my parents’ property that you won’t hit ledge one or two feet down. So what did those on Cape Ann* do about digging outhouses back in the day? I said it was a strange question. All the best,

Bob Condon Jr., February 2021

Thank you for the great conversation topic, Bob. When did your parents live here and can you relay the neighborhood? The address could help describe the specific conditions at that property. Here you go!

TIMELINE: GLOUCESTER OUTHOUSES & Waste management

Outhouses were in use well into the 20th century locally. They were also referred to as: “necessaries”, privies, toilets, loos, thrones, backyard “escapes”, reading rooms, sheds, crappers, fly factories and the office. Newspaper and pages ripped from mail order catalogues worked as toilet paper. Usually they had no window, heat or light. Some were designed with access doors below seat level to clear out the contents.

Which of the following were factored into the history of local outhouse architecture?

The answer is ALL. Water and waste management are the heart of Gloucester’s city planning.

The variable terrain of Cape Ann impacted outhouse design. If one was a farmer or owned enough land with suitable soil, they might opt for a basic “dig, bury & move” or “slide & fill” solution, rotating the outhouse footprint after it filled –faster with a bigger family– like a handheld number slide puzzle.

When digging a deep enough pit latrine was not an option, or the property was solely ledge, mucking out with rake and spreading ashes (later lime) was necessary. Waste and refuse was portable. Compost could be used for backyard gardens. Whether collected from a vault hatch, pail & sawdust, custom cabinet drawer, bucket & lid sanitary ware, or chamber pot, it did not matter. Filth, euphemistically “night soil”, could be dropped off or conveyed (eventually with a license only, and off season dates) to designated collection sites near and far, sold, or even stolen (as late as 1915 – see below!). Those who could afford to hired help or contracted with a subscription company. Municipalities like Gloucester had line items in the budget for waste collection, incineration and plumbing inspectors: These were thriving businesses.

Prior to sanitary reform in Gloucester and all of Cape Ann, the surrounding streams, marsh and ocean were availed as unmitigated dumps. The natural topography of Gloucester — all that water! all those hills! – – was considered an enviable benefit for city infrastructure and street plans, and likely delayed the city’s modern sewer system. (When public water carriage lines were introduced they could flow downhill into the harbor from densely populated areas or directed into the sea anywhere along the coast, whether for public or private owners. Out of sight. Out of mind.) Dilution was the solution.

Efforts to improve municipal services– to manage public and private waste to keep it out of the water table– were increased. Separate water and sewer lines would be regulated; eventually outhouses were a thing of the past and (quality) food scrap or compost value from home garbage was reduced to nil. You have to skip ahead a full century to find the Gloucester Harbor Clean Harbor swim milestone.

Below is a chronology illustrated with famous vs. local American outhouses, and a **selection** of Gloucester’s sewer and sanitation milestones. I’ve written a fair amount about Gloucester art and public works so a few links are provided for those as well.

You have to love Public Works.

1700s– 1800s

Those who were more prosperous had better privies and hired help for cleaning and carting. Everyone used a combination of chamber pot and outdoor toilet combo.

Outhouses for the well heeled – George Washington Mount Vernon

The octagonal outhouse at the George Washington Mount Vernon estate is an example of a high end family bathroom of its time. The custom fancy shape and finished interior convey an air of refinement. The museum describes the wood paneled, “large drawers for ease of cleaning.” (I don’t know if there’s evidence of dig and move pits as well.)

The smaller middle seat was designed for children. Martha Washington, a widower, had four children from her first marriage; two died prior to their union. Their step-grandchildren, the President’s first family, were born in the 1770s. Having suffered the loss of two little ones, and both then caring for her youngest, Patsy, who suffered torrents of seizures until her death at 17 in 1773, health concerns may have informed the bathroom layout. This opulent design could handle a potty queue when nature called family members at the same time, and adults could accompany a child in need of assistance. The museum estimates that there were four on the property.

The Mt. Vernon residence was originally built in 1734 by Washington’s father. Expansions to the main building and outbuildings were completed in the 1750s and 1770s. A century later, the historic property was rescued by a women’s preservation group. A century again, the property’s historic designation status was awarded in 1960. The exterior photograph by Frances Benjamin Johnston dates from circa 1894. The interior photograph is 2018.

photo caption: Mt. Vernon octagonal privy in vegetable garden, ca.1894, photo by Frances Benjamin Johnston, Library of Congress collection
photo description: interior view of the octagonal “Necessary”, executive privy restored (original ca. 1770), George Washington mansion, Mt. Vernon – the small middle seat designed for children. photo 2018 by C. King

Calvin Coolidge (1872-1933)

Calvin Coolidge birthplace in Plymouth Notch, Vermont was a more modest farmhouse example.

MONTANA

Restored Western gold rush hotel outhouse

Vintage postcard, 1970s. Two story double decker hotel outhouse, Nevada City, MT, a restored gold rush town

Gloucester | Cape Ann

Still standing – luxury outhouse

Driving around Grant Circle, you might have thought as I once did that the free standing out building on the Cape Ann Museum Babson Alling property was a shed. The fancy roof and architectural details inside and out give this tony privy much character. Years ago, Pru Fish and Peggy Flavin confirmed their hunch as to its original use. (Naturally, after hearing about this hidden history from Prudence Fish, I’ve dubbed this highly visible Mt. Vernon of Gloucester outhouses, “Pru and Peggy’s Privy”.)

Still standing – Rustic models

Whether restored, repurposed or replicated I’m not certain, but there are structures in Rockport and Gloucester that approximate the rough and modest models.

1870 debate about Gloucester owning its own water plant

1879 – “Sewers are a Necessity for Gloucester!”

Chairman of the City’s Highways Committee.

“It seems to me strange and very unfortunate for the city, that, by a general vote in 1877, an Independent Board of Health as authorized by the State Legislature should have been discarded. Our want of public sewerage has, in the most densely populated parts of the city, filled the soil with excrementitious matters and, in many places, covered the surface with drainage from sinks and cesspools. Some of our localities are filled with stenches that make the idea of repasts anything but agreeable…the shortest road to reform in this department is ample public sewerage, but if this be found impracticable, I would recommend that both should use all authority invested in it to eradicate or mitigate existing evils.”

Mayor Joseph Garland (1880)
Mayor Franklin Dyer ( Civil War surgeon) died February 9, 1879

Word for the day: “Excrementitious”

1881 Gloucester Water Supply Co. contract

for fire services

1886-87 City sewerage options and well water analysis by harvard

“With the introduction of water into our city comes the perplexing problem of how to dispose of the waste. During the year 1887 the Committee on Highways have extended the main drain to Foster street at a cost of $5800. The public health demands that a system of sewerage be established and built and it can be no longer delayed without serious danger, particularly in those portion of our city in which there is not natural drainage. Our present drain or sewer should have an outlet, approved by the State Board of Health, and permits could then be granted to enter the same and an income derived from these rights, which would go far toward defraying the expense of construction.”

Mayor David Robinson, 1887

“The complaints from foul cesspools and imperfect drainage are increasing from year to year, and with the increased use of water, consequent upon a public water supply, such complaints must continue to increase until some method of sewage is devised. Offensive privy vaults, filthy cesspools and sink drains, stagnant water in cellars and upon the surface of the ground, and decaying vegetable and animal matter in yards and upon vacant lots, are a standing menace to the public health…The disposal of filth and sewage is one problem confronting the city. The connection between public cleanliness and the public heath cannot be too forcibly urged upon the attention of our people. Equally if not more important is the question of the quality of the water used for drinking and cooking purposes. indeed, one great danger, if not the principal danger arising from the privy and sink vaults with which our territory is so thickly strewn, is their contiguity to the wells which so many of our people depend upon for water for domestic uses. The danger is the greater from the fact that the water itself may convey no warning of the hidden germs of disease and death of which it may be the medium. It may be clear and colorless, agreeable to the taste and without objectionable odor, and yet be seriously polluted and dangerous to health.

“Realizing this, the board pursued a liberal policy in the way of obtaining a scientific analysis of the water from wells regarded by physicians and others as open to suspicion.  In a few cases parties desiring the analysis have paid a portion of the expense, but where there were reasons to believe that the water was dangerous, such payment has not been insisted upon. The analysis have all been made by Dr. Harrington, of the Chemical laboratory of the Harvard Medical School…”

Board of Health

Board of Health 1897 sent water samples to Harvard for testing

1888 – high end residential plumbing

Toilet design heyday hit during the Victorian age. Residential plumbing products were promoted in illustrated catalogues. (Kohler porcelain tubs were promoted as early as 1883.)

1889 Worcester built a model treatment plant

1892 Clean beaches, Burnham’s water lines & drains, and NIGHT SOIL

clean beaches

“Every person should have pride in keeping our beaches free from filth…We are especially favored in the matter of fine beaches, and during the summer our own people and visitors resort to them in large numbers for bathing and recreation…Nature has so wonderfully endowed our city in the way of beautiful scenery, that we should not spoil the effect by collections of material objectionable to the eye.”

Burnham’s Field was a vegetable garden, doctor’s pond on Mt. Vernon, and Harbor Swamp

The condition of the region on and bordering Burnham’s Field and Harbor Swamp became such in the summer, that an effort was made to secure better drainage by removing obstructions from the brook which courses through these fields, and which has in Doctor’s Pond, on Mount Vernon Hill. The Board of health personally superintended this work, and when finished, a notable improvement was manifest; …Old residents refer to the time when Burnham’s Field was under cultivation and produced vegetables of marvelous size and sweetness, but the owner died and the field went to waste. In those old days the proprietor personally drained his land by means of trenches and, in the summer time, his vegetables thrived because of the natural dampness of the soil. But the question of placing houses on the field at that time would have been a difficult problem, for the water then was present in sufficient quantity to make fair skating for the children. For building purposes this land could be filled in, but it would seem to be a farce to fill in land so high above the ocean and so near to it; yet each year sees new houses going up on the edges, and last year a tract of the swamp itself was built over, which last caused the immediate appearance of the Board of Health, who immediately ordered the lots filled up, as water had accumulated in the yards and cellars in a manner dangerous to health.

The fact is that this region is highly advantageous from central location for houses or factories, and if it could be drained would doubtless be immediately covered with buildings which would bring into the city taxes to a large amount. There is more water entering the field than in the old days, because the use of city water has added to the amount which formerly was there. If it is dangerous to have vaults full, then it must be so in this region, for water stands in the vaults full, then it must be so in this region, for water stands in the vaults here unless the land is built up above the field.

Various plans have been suggested to improve this region. The extension of the Washington street main drain into this field would be a good idea. It has been suggested that a drain could be built from Burnham’s field to the wharves, through Marchant street, which is a short distance. Other plans have been talked of, but it is sufficient for our purpose to urge the need of looking into the subject. It would be a great deal better to do something permanent than to appropriate money for temporary purposes in sums which would soon amount to more than the cost of a radical improvement.

Board of Health

Night Soil – Ward Two

“Another year has passed, and the question of the disposal of night soil is more serious than ever before. By hook or by crook the contents of the vaults have been disposed of; objections have been made by those near the places used as dumps, and a discontinuance of the practice in ordered in one or two instances. Where will our night soil and sink waste go next year? At present, a farm in Ward Two offers the only available chance; as last year, other places may be used until the objections become too numerous, but what would we do in case of cholera appearing near enough to frighten us? Would anybody want this material which would be suspicioned anywhere near them? There will be difficulty without the cholera, but with it we can only say that something would have to be done.”

There are four methods by which this material may be gotten rid of: The first by dumping on land; the second by dumping in the ocean by means of a scow; the third by cremating it by means of one of the well-known processes, as the Engle, the Simonin and others; the fourth by building a sewerage system.

As to these methods, the dumping on land accommodates many by the discomfort of others.

The scow system is very cheap, and could probably be rendered available here. The cremating process for night soil could hardly be given intelligent discussion just now, and cremation finds its largest use in the disposal of garbage. Sewerage would drain the central and thickly settled parts of our community and, of course, would do that well, and it is probably only a question of time, when sewerage will be introduced here.

GARBAGE – PIGS – SWILL- NIGHT SOIL: Board of Health argues for SCOWS FOR OCEAN DUMPING

The practice of throwing garbage on vacant lots and dumps still continues, but most of the swill is collected at the houses and fed to swine. Considerable material is of little value for this latter purpose, and this finds its way into the stove or to some vacant land. In view of the tendency to discuss the subject of cremating garbage, it seems wise, for all, to inquire how much garbage there is to be disposed of. If a crematory were established, it would by no means indicate that all table and cook-room waste, or even all provisions, fruit and grocery store waste, would be cremated, for then, as now, pigs would be kept in some out of the way places, as there is some profit in it, and it is not to be supposed that sentiment can soon rise to a point where prohibition of the feeding of swill to pigs, or the absolute prohibition of keeping pigs, will be ordered. This, then, leaves only a portion of the garbage of the city to be disposed of, and this could very conveniently be placed in a scow, which being absolutely tight and covered, would not cause an objectionable odor, even though it were mainly used for night soil. If a scow is of advantage for this purpose, then there is no place on the coast so favorably situated for using it as our city. Certainly the cheapness of the method and probable reduction in price per load for removing vault contents would commend it.

1892 Gloucester Board of Health – Murrow, Thurston and Dennen

Boston scenes by Leslie Jones, collection Boston Public Library [tug pulling garbage scow) 1956; and boats and garbage, no date (circa 1917-1934)]

1893 Ocean proximity deemed great for Sewer Plans. Also, Drain Burnham’s Field!

“There is no question in the minds of any of us, but that our city needs a system of sewerage. The proper disposal of sewage is one of the great questions of our age. Our city is favorably situated, being so near the ocean, for sewage disposal. It has already been surveyed for the introduction of some system, and the plans are on file and will be available whenever the action of, or financial condition of the city, will warrant such proceedings. My attention has been called to the necessity of draining Burnham’s Field and vicinity, as a sanitary measure. I would recommend that, if practical, the drain leading there from be cleared from obstruction and the natural outlet to the sea be utilized for that purpose.”

Mayor Benjamin Cook, 1893

1893 Disposal of Night Soil and Sink Waste. Burnham Field Development as one option proposed.

“The Board of Health is often obliged to order the discontinuance of dumping in certain places when too great a nuisance has been caused, while the owners of the land sometimes do the same for various reasons. It seemed in the spring as if there was no available place, and the Board appealed to the City Council, which appropriated two hundred dollars, to be used in relieving the difficulty (no pun intended). None of this money was expended for that purpose, as places were secured without the interference of the Board of health. There is a great deal of objection made to the dumping of night soil on land, and wherever it is done it generally annoys somebody. If sewerage is not soon adopted, the city must resort to some method less objectionable than the present method of disposing of night soil and sink waste…”Burnham’s Field and Harbor Swamp: It seems that there has been some disposition to investigate this region during the past year, on the part of the City Council. The presence of such a large tract of swamp land in the heart of a city must be a menace to health. Buildings are being put up all around it and even in it, and this fact must cause some attention to be given, as it increases the amount of filth which finds its way into it. Objection to acting on the score of the land being private property, would hardly seem to be altogether reasonable, as the benefit arising would be shared by the whole city. To deepen the “brook” which flows through it, or to continue the “main drain” into the district, while it would not probably be a complete system of drainage, would furnish an outlet which could be utilized by the abutters at some expense, for the purpose of draining their land. At present there are two ledges in the course of the “brook” which should be removed by the Boston & Maine Railroad Company or in some other way. The water in the swamp will not fall much below the level of these ledges. After their removal the “brook” might be deepened. The people of this region should have some way of relieving their premises from the natural fall of water and the volumes of “City water,” which must find its way into it from the surrounding houses. At present no sink or privy vault can be dug in this region.”

Charles H. Morrow, S.S. Thurston, and Wm. H. Dennen, BoH 1893

1895 residents vote to buy gloucester water supply but it’s not a done deal

$1,500,000 for “22 miles of cement lined pipes, pumping station, reservoirs and their property acquired for storage and distribution throughout the city.”

$1,500,000 for “22 miles of cement lined pipes, pumping station, reservoirs and their property acquired for storage and distribution throughout the city.”

“Percy Blake places the cost of the entire plant at not over $269, 977. He further states that the average length of satisfactory life of this kind of pipes is from 15 to 20 years, and that Somerville, Manchester NH, Fitchburg and Worcester and other places have for some time been replacing the same kind of pipe with cast iron…”

“We must undertake a system of sewerage, but a full consideration of the matter must be deferred until a settlement of the water question. We can, however, begin in a small way…

excerpts, Mayor Robinson

1895 Gloucester Ordinance – waste management

House drains, water closets, cesspools, and grease traps

An ordinance relative to the licensing of Plumbers and the Supervision of the Business of Plumbing”

  • House Drains. The portion of the house-drain which is outside of the building and more than four feet from the foundation walls shall be constructed of extra heavy cast iron pipe or of the best quality vitrified drain pipe; that portion of the house drain which is within four feet of the foundation walls, under the buildings or inside the walls, shall be constructed of iron pipe and shall have a fall of at least one-fourth of an inch to the foot; shall be securely fastened to the cellar wall or suspended from the floor in iron hangers; but when a portion is necessarily laid beneath the basement or cellar floor, that portion shall be construed of extra heavy cast iron pipe and shall be laid in a trench having brick or stone walls, of sufficient width and otherwise so arranged as to give free access to all joints.
  • The house drain shall have a hand hole for convenience in cleaning; if the trap be inside the cellar wall, the hand hole shall be on the house side of the trap (at discretion of Board of Health)…
  • When a water closet or other fixture is to be placed in a house, the house drain shall be changed to conform…
  • No cesspool shall be within twenty feet of any cellar wall except at discretion of the Board of Health
  • Suitable Grease Traps shall be constructed under sink of every hotel, eating house, restaurant or other public eating place so arranged as to be easily accessible and with suitable provision for its proper cleaning…

Sect. 15 WATER CLOSET SUPPLY

“That the regulations of governing plumbing are in the interest of public health, no better exemplification can be given than by calling your attention to the large number of jobs of plumbing and house drainage found defective by your inspector. Having examined some 200 houses where there had been contagious diseases, I found 90 percent without traps or ventilation, the gases from cesspools, escaping into the house, through the sink wastes, some houses with leaky waste pipes passing directly over cisterns, containing drinking water; and in one case all sewage matter deposited into a brick cesspool (formerly a rain water cistern), placed directly under dining room.  The water closets located in cellar directly under parlor without flush of water wand all deposits on ground with very imperfect ventilation. This was was in an outlying district. In my experience of some 35 years, I never saw a case in a more unsanitary condition…”

Plumbing Inspector for the City of Gloucester, 1895

Late 1890s – Thai delegates

From Gloucester archives – Thai delegates summer in Gloucester as early as the late 1890s. (Skip to 1916 and 1921 for more about Prince Mahidol , “Mr. Songkla”) – research by City Archives members

Gloucester – Victorian Age outhouses

Gloucester housing stock (and hotels) included luxury homes with bathrooms and water closets as well as modest solutions. Rough outhouses were common, too. Can you spot the outhouses downtown and in East Gloucester? (Reminder: you can pinch and zoom to enlarge and right click for descriptions. Some media offers option “increase file size”.)

Then (below the garden) | Now

1900 Board of Health is frustrated about the city’s sewer managment

“Sewerage is a much mooted question, which the Board of Health have tried to bring to the attention of the city council, but so far have been unsuccessful in calling their attention to a much wanted service to the city.”

Budget appropriations include two additional contractors:

  • J.A. Dennen, cleaning sewer
  • George A. Reed & Son, sewer gratings

“Dikes’ Meadow and Wallace Pond reservoirs are the only sources of supply now used…”

“Average daily use is 900,000 more than two reservoirs can supply…”

“New water plant necessary…there is water enough in West Gloucester. To supply the city a hundred years….go to Chebacco lakes and (Dikes , Wallace Lily Pond and pumping station become worthless, money thrown away)—a new pumping station at lakes (would be an)  arrangement satisfactory to town of Essex…”

“As far as purity of water all agree Haskell’s Pond stands first…” – Haskell dam to come.

1902 haskell dam construction

For a deep dive into Gloucester’s water utilities, read about Haskell Dam history here

1905 Board of health presses its case

“…menaced, by contagious diseases which threaten to become epidemic…resources at the command of this board, very largely inadequate, would be materially strengthened by a suitable building for the detention and isolation of contagious diseases*, such as diphtheria, scarletina and measles…

Very many nuisances have been investigated and abated during the year and the number has been augmented by the foul odors arising from catch basins along our principal streets. After thorough investigation by its Agent, it is the opinion of the Board of Health that such foul odors arise from the contents of sink and privy vaults which empty into said basins. This condition, deplorable indeed, is unavoidable so long as the present unsanitary condition, due to lack of sewerage, obtains.

And again the Board repeats its annual recommendation to the City Council to take immediate steps to remedy this condition and thus thwart the danger with the absence of a proper system of sewerage in a city approximating 28,000 inhabitants persistently presents…”

Board of Health, Gloucester, MA, 1905-

*see Gloucester’s 1918 Flu epidemic (resulting Braewood purchase)

The Mayor lobbies for dredging Annisquam and for more playgrounds for children.

1910 – a better year for the city’s waste management. Centennial dump plans

”Wherever a vacant lot is found, it is liable to be used by the neighborhood for a dumping ground for rubbish, tin cans and other unsightly objects and sometimes animal and vegetable refuse; the owners of these lots are often unable to prevent such use of the property. The Board of Health has paid especial attention to these places and a great improvement has been made. If Gloucester could establish a reputation for cleanliness, we believe it would be of great financial value to the city. The city dump on Centennial Avenue is available for all kinds of ashes and rubbish and is well cared for; in time this land will be available for public use, but large quantities of good filling material will be needed; however, satisfactory progress has been made and a large quantity of material has been already deposited.”- Board of Health

collection: c. ryan

Walter Cressy’s land on Bond’s Hill was taken for a new reservoir.

1911 Sewage outfall report

1911 Modern plumbing catalogue

1912 Richard T. Crane, Jr. builds a summer cottage in ipswich

(see 1925 – Crane Jr. expanded his family’s industrial frim, booming throughout the Gilded Age, into a global powerhouse by the 1920s. They manufactured ironworks, cooking stoves, bathroom fixtures product lines.)

1915 – water commissioners report- hotel & Summer resident impact (more bacon)

Gloucester population was estimated to be 24,478 in 1916 and to increase up to 36,000 in summer. The estimate of residents on the city’s pipe line, “including summer takers”, was 35,000 and water consumption 46.2 gallons per inhabitant (479,370,834 gallons total per day).

One city budget line item for 1916 that became obsolete was (extra) waste removal help.

  • Union Water meter company- waste stops (like bus stops)
  • Arthur G,. Osboro – oil and waste
  • Royal Mfg. Co. – waste
  • Lewis E. Tracy Co, – waste

“DUMPS: The practice of using the nearest vacant lot for the dumping of paper and filth continues; this is often done at night to prevent detection. People should place such materials in barrels or other receptacles and have them removed, as it would prevent a good deal of ill feeling in neighborhoods.

VAULTS (night soil): Neglect to clean out privy and sink vaults is a common cause of complaint. It is unfortunate that owners of them cannot enter suitable drains, but it not excusable to neglect them until they overflow or emit a foul odor, which vaults are apt to do in the summer months.

Summer residents increased concerns.

SWILL: “The large quantity of house waste in summer due to the influx of summer population at hotels and the relatively small quantity in winter creates trouble. If all swine could be slaughtered at the end of the vacation season, much trouble would be saved; but, as it is, swill is often not collected in the center of the city in summer and so numerous are the collectors in winter that complaints of swill stealing are frequent. The Board of Health has little power to correct these conditions, as only under a contract system can the collection of house waste be controllable.”

1916

As of 1916, Gloucester residents were still encouraged to fill the public dump on Centennial for a future playground. (A generation later, this repurposed transformation would receive national recognition as a WPA project. See 1930s.) The City’s Plumbing inspector lobbied for a modern sewer. DPW was praised.

“The streets of the city have greatly improved in appearance and cleanliness and the chairman of the highway committee should be highly commended for the great interest he has displayed in street cleaning.”

Mayor John Stoddart reviewing 1916 and a shout out to DPW

Appropriations detail that the Union Water Meter company made waste stops and Arthur G,. Osboro oil and waste; Royal Mfg. Co. waste; Lewis E. Tracy Co, waste

1916 boston globe prince mahidol

Prince Mahidol of Siam enrolls at Harvard to study public health.

“The Prince, or “Mr. Songkia,” he prefers to be known in this country, has been staying at Gloucester for some weeks.”

read the article: “Brother of King Mahidol…” Boston Globe, September 1916

While studying in Cambridge he stayed in the house where “Robert Lincoln, son of Abraham Lincoln, was living when the news of his father’s assassination was broken to him.” The Prince continued to spend his breaks and summers in Gloucester (Bass Rocks) which inspired his public health thesis.

1917 Art studios

Scattered throughout Cape Ann, converted outbuildings for art studios likely included outhouses.

“One day we were motoring through Gloucester and, always interested in art, were going from studio to studio to see what the artists were doing and to purchase some pictures for our home on Chebacco Island. We found many of the artists tucked away in dark little lofts, old outhouses, chicken coops, stables, tiny rooms, poorly-lighted and unattractive makeshift places such as one might find in an old-time fishing village–little spaces that had been discarded by the fishermen. We were inconvenienced by the difficulty of seeing the pictures and thought others might be. We felt in this active summer colony there might be many like ourselves who would welcome an opportunity to see what the artists were doing. Here was our chance — beautiful pictures, a leisure public anxious to see them. We would provide the place.’ ” 

Emmeline Atwood quote, 1917 Boston Herald article by Gustav Kobbe – about Atwood’s Gallery on the Moors published on the occasion of its 2nd annual season

1916+ Outhouses in early Stuart Davis

1919

US Public Health Service illustration example

US Public Health Service- 1919 view of a single seated sanitary privy (rough bucket & lid ware)

1919 City Sewerage Plan

“The most important matter that this city faces in the immediate future is the question of sewerage. The action of one of the leading fishing firms of the city, who own a large part of the business water front, in notifying all persons who have had the privilege of the use of their docks for sewerage, that such privileges will cease within five years, will undoubtedly be followed by similar action by the owners of every other dock in the city. This action was to be expected, and the wonder is that it has not been taken before. But such action brings to a head the question of what Gloucester and its inhabitants who have had such privileges so long, will do, and that question can only be answered by saying that Gloucester will now have to do something that it can no longer delay. Five years will quickly pass, and before that time something tangible will have to happen. It is a big question, the question that involves the expenditure of a large amount of money, and requires far-sighted action.”

Mayor Brown

1920 Sewerage Question is a matter of public heatlh

“We must meet this sewerage question this year. I recommend that an entrance fee of $1 per front foot on all property on the line of any public sewer be collected and used for the extension of sewerage, or for the payment of the interest on a sewer loan. This should give us perhaps $15,000 for this purpose this year. But no sewerage plan which does not provide for the cleaning of the dead water of our inner harbor should be considered. This is a growing menace to our health, and to our future as as summer resort, for in July and August our inner harbor is filthy. I am glad to say that one of our summer residents, a man of great wealth and knowledge, has written me a fine letter of congratulations on my election and offered his assistance in working out a plan without much cost to the city. I have great hopes of something good from this. ”

Mayor

1921 – Sanitary Survey of the City of Gloucester, Massachusetts

“Sanitary Survey of the City of Gloucester, Massachusetts”, 1921 by M. Songkla | Prince Mahidol

He concluded the city’s sewer management and all those outhouses very much still in use were the primary source of disease, not summer residents and tourists.

See Sarah Dunlap’s research, Gloucester Archives, to learn more about Prince Mahidol.

“He himself went to many schools to survey their heating, food, health and toilet facilities, — he went to the Lane, Sawyer, Collins, Western Avenue (Parsons) schools and the High School at the time (the brick building just across the street), and he went to the Haskell Reservoir in West Gloucester. He also brought in his personal knowledge from staying in East Gloucester hotels and the Sherman and Way cottages in East Gloucester…

“He had photographs of the sewer outfalls into the ocean, including one from the Bass Rocks Hotels that flowed into the ocean just below the Sherman and Way cottages, where the Siamese legation often stayed. In downtown, outfalls were at docks in the inner harbor. And he not only described the existing system and numerous problems in public health, but he had recommendations for solutions to each problem.”

Sarah Dunlap on Mahidol’s thesis, 2016

See also Harvard, T. H. Chan School of Public Health, Preserving Thai History the King of Thailand Birthplace Foundation, Harvard Medical School. Celebrating the legacy of His Royal Highness Prince Mahidol of Songkla: a century of progress in public health and medicine in Thailand, 2016.

And “Celebrating Thailand Father of Public Health and Modern Medicine”

1924 East Gloucester residents PUSH FOR sluiceway at smith cove – THE FISHING INDUSTRY IS DEAD

“PLAN FOR CLEANSING WATER MEETS OPPOSTION

The Municipal Council was well filled last night by persons from the East Gloucester section interested in the hearing relative to the petition of John L. Lorie and others that a tide runway be cut from Smith’s Cove at Rocky Neck, connecting with the outer harbor at Wonson’s Cove. Mr. Lowrie, in advocacy of the project said that the matter was one which had agitated the people of the locality for many years. they thought if the proposed cut were made it would cleanse the stagnant waters and materially clean up the waters which had become polluted by fish offal and sewage. Since the fish business had left the locality the place had become a Summer colony and something should be done to remedy the situation. In response to his request about a dozen people arose who favored the proposition. Carle T. Tucker, Nathan McLeod, Capt. David F. Mehlman, assistant city marshal, and others, property owners on the other side, opposed the plan. Mr. Tucker said that in the event of such a sluiceway being constructed the sewage and offal would run into the outer harbor and be deposited on the rocks where the summer residents congregate and spoil the place for bathing purposes. It was the only beach in the locality and should be preserved in a cleanly condition. Capt. Mehlman said he had rowed to and fro on the place through the harbor on his way to the Police Station for 40 years and thought he had a a knowledge of conditions. He strongly opposed the proposition which would convert the only white sand beach in the locality used for bathing into a muck deposit. Deputy collector of Customs Albert H. McKenazie, a property owner in the locality, Mr. Brown, whose wife owns a tea house, and Nathan McLeod, owner of a summer hotel, opposed the proposition. A letter was received from George O. Stacy strongly condemning the plan and stating that if it were undertaken he would oppose it by litigation…”

Boston Globe, 1924

1925 Sewer not fish “Odor drives summer residents away” – bill for state funding

Dr. Kelly Blames Gloucester sewage.

“It is the odor caused by poor sewerage, not the odor of fish that drives summer residents from Gloucester,” said Dr. Eugene R. Kelley, State Commissioner of Public Health (For more about Kelley see 1918 Flu Pandemic), before the Legislative Committee on Public Health, appearing for his department relative to the question of the disposal of the sewage of Gloucester. “This is purely a local matter and a matter which must be attended to immediately,” he added. Dr. Kelley said that Gloucester had the worst waterfront conditions of any city or town in the Commonwealth. “Gloucester is a great food center advertises cleanliness,” he said. “how can Gloucester continue such advertising with sanitary conditions as they are?” N.N. Goodnough, chief engineer of the State Department of Public Health, said that tests had been made of the currents and tides about Gloucester Harbor and conditions were found to be satisfactory. He added that he felt this was an immediate necessity and would cost about $331,000. Alden Roberts, official representative of Gloucester; Carl Philips, President of the Gloucester Chamber of Commerce; William J. McGinnis, ex-Mayor; Alderman Smith and Representative John Thomas also spoke in favor of the bill. There was no opposition.”

1925 Crane estate – plumbing magnate Richard T. Crane, Jr. builds a new Castle Hill mansion.

Richard Crane (1832-1912) was born in New Jersey and working at the age of 10 to support his family after his father died. In his twenties, he made his way to an uncle in Chicago and set up a small contracting outfit. His younger brother joined him and they cofounded Crane Bros. They manufactured plumbing fittings, expanding the product line and reincorporating as they grew into a major American company. The estate and business was passed to Richard’s heirs, the two sons, Charles and Richard, who fought over the helm. The Trustees attempted to settle the matter by voting the eldest to lead, Charles, who agreed. Richard did not. The litigation that ensued was not drawn out. Within a couple of years, the younger brother bought the older one out.

Richard Crane, Jr., took the company global. Florence Higinbotham and Richard Jr. were married in 1904. (Her father cofounded Marshall Field & Co.) Legend “blames” Florence for the stunning Crane estate we see today, designed by architect David Adler. Florence, so the story goes, loathed the presumably equally stunning 60 room Italianate style of the first mansion. Her husband promised to rebuild it for her if she felt the same way in 10 years. Conveniently for the global leader in convenience designs, she did. The new one featured Crane’s modern bathroom and systems designs.

Crane Estate completed 1928. photograph: Catherine Ryan, 2016

1920s-1926 City’s Modern Sanitation system construction Completed

1927 Stacy Boulevard pumping station

1928 – sewer concerns bubble up related to controvertial cottage Development on Eastern Point

Eastern Point: Smith Cottage Sewer Plan Menace to Health | Complaint by Archbishop Against Site Near St. Peter’s Chapel

GLOUCESTER, March 29- The controversy that arose last Fall between the Eastern Point Summer colony and Arthur W. and Herbert E. Smith who seek to build 45 small cottages on their property at Eastern Point came up today before Starr Parsons of Lynn, appointed by the court as master. This case, fought out in the Municipal Council last Fall, involving personages of prominence, attracted widespread notice. The bill of complaint was filed by the Roman Catholic Archbishop of Boston against the Smith brothers to prevent the building of the camps and to cause the removal of a tea house, dance hall and roadside stand already erected under a permit from the Municipal Council. Dist. Atty. Fred H. Tarr and Henry V. Cunningham of Boston were the lead counsel assembled for the objectors and Carlton H. Parsons and Dist. Atty. William G. Clark Jr. appeared for the Smith brothers.

The morning was spent in an inspection of the premises at Eastern Point. The first witness of the afternoon was Arthur W. Smith, who testified as to the general construction of the camps and especially the method of sewage disposal, either by septic tanks or cesspools.

Prof. George E. Russell of MIT testified that the terrain at Eastern Point is rocky and ledgy, covered with pulverized and rotten granite with a slight topping of humus, and that neither septic tanks nor any forms of underground sewage disposal were feasible by nature of the soil but would create a menace to health.

A regular water-flushed sewerage system to the sea would be prohibitive in cost, from $10,000-$100,000.

Prof. M.P. Harwood of MIT corroborated Prof. Russell’s testimony.

The proposed site of the cottages is Farrington Ave near St. Peter’s Roman Catholic Chapel (St. Anthony’s) built by Mrs. Margaret E. Farrell of Albany, one of the wealthiest owners of show places at Eastern Point.”

Boston Globe March 1928
1930 Alice M. Curtis chapel photo printed archivally from original 5 x 7 film negative
© FREDERICK D. BODIN

Margaret Ruth Brady Farrell (1872–1944) was not in Gloucester in 1928, in case you’re wondering why her philanthropy and voice were missing. Margaret married James Charles Farrell. Their primary residence was Albany. Her famous financier father, Anthony N. Brady, was born in France to Irish parents, “practically penniless”. At the time of his death in 1913 the magnate had amassed a great fortune estimated to be worth 100 million, “one of the few men in New York State whose fortune was discovered to have been much greater than the estimates made of his riches when he was alive.” Their philanthropy in Gloucester may have been greater but tragedy kept them away. Although the estate was split equally, some of her siblings fought bitterly and long. Margaret likely had no energy or inclination for objections, nor held the reins. The year before her father died, four of their family died in a train wreck, burned alive. Her sister. Her sister-in-law. Two aunts. Her husband died in 1918.

1931 Babson Reservoir and Sanctuary

There are examples of land preservation, but featuring a watershed in 1931? Isn’t it wonderful!

1930s New Deal Sewer work

By 1938, W.P.A. workers (Massachusetts) laid close to 200 miles of new water mains and even more miles of new sewers. They built 15 new sewage disposal plants, thousands of manholes and culverts, tens of thousands of roadside ditches & culverts, and miles of curbing.

1933 crane (plumbing) company – a sponsor and featured at Chicago World’s Fair

excerpt from the official guide book to “A Century of Progress International Exposition in 1934, the World’s Fair at Chicago” The guide book

“contains the fullest and most accurate information possible for the purpose of directing our visitors how to find everything in the Exposition and how to make use of the Exposition’s facilities for their comfort and convenience.

“Crane Co. Station 134 had its own pavilion Display of bathroom fixtures and plumbing, also the “World’s Largest Shower”—Crane Co. Station. Home and Industrial Arts Group.

“A 45-FOOT SHOWER bath is a refreshing attraction. The shower is a giant reproduction of the company’s shower bath equipment. At the base of the tower is seen, in contrast, a bathroom used in 1893. Here, also, is seen a modern, de luxe bathroom. Display of antique and historical plumbing fixtures includes a “chaise longue” French bath tub of 100 years ago, a French lavatory 150 years old, a bath tub shaped like a hat that was in vogue in this country after the war between the states, and a bath tub of the type used by Queen Victoria in England.”

“Home and Industrial Arts Group. The NEW possibilities of the ideal small house are demonstrated at the Exposition in the Home and Industrial Arts section , by a group of completely finished, furnished and equipped homes, ready to live in. The new methods of building with new materials and with prefabricated units for rapidity and economy of construction are shown.”

1933-34 “Century of Progress” Chicago World’s Fair

gLOUCESTER OUTHOUSEs in American PAINTINGS

Selection of Gloucester scenes with outhouses by various artists: Dennis Miller Bunker; Charles Burchfield; Stuart Davis; James Jeffrey Grant; Emil Gruppe; Edward Hopper; Max Kuehne; William Lester Stevens; Paul Bough Travis; Louise Woodroofe.

Artists and photographers cropped outhouses out.

Let me know if there’s a favorite you’d like to add. Once you notice them, you’ll find more.

Reminder: You can pinch and zoom to enlarge (and select “full size” image if that option shows)

EDWARD HOPPER – gloucester outhouses

Edward Hopper included outhouses in numerous Gloucester vistas. Hopper depicted buildings and worked with watercolor and gouache long before his renowned first sell out show of Gloucester images in the 1920s.

The Whitney Museum of American Art has the largest collection of Edward Hopper art. This small watercolor study the museum dates circa 1900 contains germs of his later work. There is an elusive building, or nestled buildings, front and center. Strong shadows are emphasized. Is the shed attached or not? An entrance, a ticket booth, an outhouse? Is that a circus tent flag squiggle? The pencil line beyond the vertical street light (or railroad signal) might be a train track. Further right, there’s a red dab. Perhaps another structure. The window with yellow has a barn vibe. I did think about the scene in Butch Cassidy and the Sundance Kid when Katherine Ross looks down from a hay loft to catch the Paul Newman riding a bike for the Raindrops Keep Falling on My Head show.

Whitney Museum estimates circa 1903

1930 – 1941 American outhouses – cross county photos

photographs outhouses across America – Library of Congress

  • Cincinnati row houses with backyard outhouses, 1930s
  • privy plant pre cast base, Missouri, by Lee Russell, 1938
  • Placing concrete in form for privy slab, MN, by Shipman, 1941, Library of Congress (collection FSA Office of War Info)
  • South family’s shaker style privy, Harvard, Worcester County, MA 1930s
  • General Israel Putnam Privy, Brooklyn, CT after storm
  • Arlington, MA, Walker Evans 1930s
  • Privy Monterey, Delaware, circa 847
  • Washington DC “slum” privy, Carl Mydans, 1935
  • “old six hole privy, Wiggins Tavern”, Northampton, MA, Lee Russell, 1939

photographs Indoor bathrooms residential and public – New York Public Library

Cincinnati backyard outhouses

1938 NYC – Masterful Mabel Dwight

MABEL DWIGHT, 1938

Leave it to Mabel Dwight for a humorous and original take, Backyard, 1938 WPA/FAP lithograph. Outhouses were shared; doors were left open. Rear window… (last pun!)

1942 Boston

1942- photo: Leslie Jones, BPL collection

1963 North Shore Sewage a threat to beaches

Boston Globe North Shore News- “Town Sewage Problems Pose Threat to Beaches” by Anthony Romano –

“Is pollution posing a threat to the recreational facilities of the North Shore’s coastal communities? Local officials from Marblehead to Gloucester thinks so–as evidenced by the closing of beaches at various times during the past few years because of sewage carried shoreward by winds and tides. The possible corrective solution rests with the Legislature which has been asked for an appropriation of $15,000 to investigate and study the pollution problems in the affected harbors and tributaries. There is considerable anxiety among North Shore officials who point out that conditions will worsen with each passing year because of the increasing influx of industries and new residents.”

1978 CRACK DOWN AT THE QUARRIES

Litter and parties – Read  Crackdown at the quarries 

1980 Gloucester Clean Harbor Swim

The Federal government sued Gloucester for dumping raw sewage. Before it was celebrate Gloucester Harbor it was clean it. Read more about the gains 1970s and 1980s.

1981-1984 New sewerage treatment plant construction

Dedicated to George P. Riley


2019 – Bacon grease, “flushable” wipes and fatbergs – NOT Gloucester

In 2019, Mike Hale, Director of Public Works, explained that this diaper wipe fatberg issue was not a crisis here as it was in the municipalities featured in the viral London video.

During the pandemic, stories increased about sewers clogged by even more wipes, protective wear and disposable masks. Again that was not overly remarkable here.

bacon grease poured into can not drain ©c ryan.jpg

My grandparents never wanted a dishwasher. They collected the food scraps (all the wet garbage) by the sink until they tossed it outdoors in the backyard garbage pail. A metal bin was inlaid underground roughly in line with a flagstone path. The heavy cover was raised with firm stomp on a foot pedal, a novel chore for us because our home did not have one. I don’t remember it smelling, but it was just the two of them. The garbage collectors took care of pick ups from there. My husband’s grandparents raised pigs, so it was direct deposit there.

2021 Water pollution Control

Author Note related to original question from GMG reader

*What’s in a name? I’m perplexed about a convivial nickname for “those on Cape Ann” myself. Cape Anners, Cape Ann-ites, other capers? Nope. Nope. Nope. I’m told Cape Cod natives may say “islanders”, though I’ve never heard that from my relations there. Maybe it’s Massachusetts? Massachusetts-ite is so awkward. Bay Stater- a marketing stretch too far. Bostonian works!

Mayor Romeo Theken instrumental in securing 3 million MassWorks grant for infrastructure upgrades #GloucesterMA

Mayor Romeo Theken was instrumental in securing funding, including a MassWorks grant, for another generational neighborhood infrastructure overhaul in Gloucester, Massachusetts. This soup to nuts improvement project– water, sewer, drainage, pavement, & utilities–impacts several streets including: Cedar, Millet, Sargent, Shepherd, Trask, and Warner. Some original sewer pipes were a century old.

gloucester ma infrastructure improvements coming to streets here_google maps

Gloucester DPW works in concert and alternates with various partners as the work is completed. While National Grid is up at bat currently with the utitlity upgrades, DPW is demobilized. The gas complany is replacing aged gas lines and mains, and improving services. It may have a wider scope than the city utility work.

photo caption: street work view down Millet Street, Gloucester, Massachusetts. City Hall and St. Ann’s in distance:

view down Millet St. Gloucester MA__thanks to Mayor, DPW getting $ past finish line _3 million all grant funded_ MassWorks_ infrastructure improvements_photo © c ryan 2020 Jan 14.jpg

photo caption: Millet and Warner Street , Gloucester, MA (Jan. 14, 2020)

Millet and Warner Streets_thx Mayor, DPW getting $ past finish line _3 million all grant funded_ MassWorks_ infrastructure improvements_Gloucester MA_ photo © c ryan 2020 Jan 14.jpg

Thanks to Mayor, DPW getting $ past finish line _3 million all grant funded_ mass works_ infrastructure improvements_Gloucester MA_photograph copyright © c ryan 2020 Jan 14 (2).jpg

National Grid marks street_thx Mayor, DPW getting $ past finish line _3 million all grant funded_ MassWorks_ infrastructure improvements_Gloucester MA_ photo © c ryan 2020 Jan 14

Lobster Cove: Gloucester DPW rebuilding stone wall along Washington Street / 127 (and brush clearing at Bennett)

Brett Chelsea and John_Gloucester DPW stone wall repair Lobster Cove_ Washington Street_Rt 127_20191009_© c Ryan.jpg
Brett, John, Chelsea – DPW crew covers their masonry work in progress on the stone wall by Lobster Cove October 9, 2019, ahead of a forecast nor’easter, Gloucester, Mass.

CAUTION- slow down!

Gloucester DPW crews are restoring the old stone fence along Washington Street/Rt 127 between the Annisquam footbridge and Annisquam Church. They are filling and resetting capstone and top stone along its length and attending to areas of greater disrepair. The fence on this route has been hit by cars more than once. Estimates for contracting the work went far outside the department’s budget. Thankfully, Gloucester DPW is up to the city maintenance of a traditional public works build.  They began the job last week (see below)

BEFORE (and one in process/mortar)

 

AFTER

So far- Gloucester DPW is just a fraction of the way into this project. They’ll tackle sections at a time.

Gloucester DPW repairing capstone and topstone by Lobster Cove Gloucester MA_20191009_©c ryan (2)

Gloucester DPW repairing capstone and topstone by Lobster Cove Gloucester MA_20191009_©c ryan (1)

Goose Cove

Gloucester DPW repaired the stone wall at Goose Cove (also hit)

Gloucester DPW stone wall repairs Goose Cove Bridge _20191009_© c ryan.jpg

Nearby another DPW crew completed much needed roadside overgrowth clearing on Bennett Street up towards Dennison Street

Before (Google Street view) / After

 

It’s time! temporary fencing at Stacy Boulevard ahead of the railing replacement

IMG_20190912_083649.jpg

 

Part of Gloucester DPW ongoing Stacy Boulevard work, this new railing will extend east, continuing the look of the promenade western side. Future phases involve grounds work. AFTER comparisons will be in this direction.

IMG_20190912_083749.jpg

The sidewalk ends at O’Maley! Gloucester DPW completing massive work from the Mills & Washington up along Reynard and Cherry Streets

More back to school beauty…

Leveraging complete streets and Chapter 90 funding, Gloucester’s DPW is completing a big project on Cherry Street at O’Maley. Sidewalk and street improvements follow along Cherry towards Reynard, stretching straight through to Washington Street. The work will be completed in a week or so.

 

 

 

Back to school beauty | new sign, lifted trees, entrance spruced at Gloucester High School

courtesy photo from john DPW.jpg

John from DPW described some Gloucester High School curb appeal betterments we happened upon today and kindly shared this photo for Good Morning Gloucester.

John, Nick, Fred (electrician), Tommy, Brian, and Billy from Gloucester DPW have been finishing some corrective cement walkway work and assorted grounds keeping at Gloucester High School. Over in the parking lot, the trees are looking sporty-spruced, and they’re easy to walk under now they’ve been lifted. Overgrown brush has been cleared and hauled off with more to come. Loam is being delivered for the ground around the new entrance sign (class gift) readying for the wonderful gardeners touch still to come.

 

 

Coming soon! ADA sidewalks & paving | Gloucester DPW at work along School St from Prospect to Proctor by library and fire station

Helping people move safely and easily throughout the city is a contant Gloucester Department of Public Works directive. One recent construction project with CDBG ADA funds that’s fast finishing will be a welcome addition in the neighborhood along School Street between Prospect & Proctor, before the Gloucester Fire Department and back of the library. The new sidewalks extend roughly .10 mile each side. Expect some road closure to cars and no parking through May 10th. I’ll post Before/After pictures when the work’s complete.

 

 

school street work.jpg

In the meantime, here is a completed Before/After sequence- the evolution of the Duncan Street sidewalk and road repairs September-October 2018.

 

 

 

 

expect a little bit of traffic on RT 127 as Days Pond wall and sidewalk get some Gloucester DPW love

Gloucester MA DPW Days Pond stone work Dec 2018 (3)

 

Another Gloucester DPW project began last week along RT 127, near Wolf Hill, at Days Pond. The fence and wall have been damaged over the years from simple wear and tear, and even automobile accidents. “A recent one took it from more than just an eyesore to potentially dangerous,” Mike Hale explained. The wall is being replaced and raised. The crew will be there a couple of weeks this December to complete all that is doable in winter, and return in the spring to finish the job. Since the crew began the pond has frozen over and thawed. Note the stone work.

Enjoying scenic overlook on Thatcher Road walkway to Good Harbor Beach

Beautiful build by Gloucester DPW to Good Harbor Beach is seeing steady use. The new pedestrian bridge spanning the marsh little river makes it easy to linger over a sweeping November vista to Good Harbor Beach and back.

IMG_20181129_161100.jpg

Prior posts on Good Morning Gloucester about the marsh walkway under construction. 

October 6, 2018 snazzy new guardrails

September 12, 2018   construction begins

DPW making public works work: great marsh walk along Thatcher Road from Good Harbor Beach entrance to footbridge Gloucester Massachusetts

View to Good Harbor Beach across marsh_from the future sidewalk_Gloucester Mass_2018 June 30_©catherine ryan
back of Good Harbor Beach, framed and open views across marsh from Thatcher Road, June 2018  

Walk this way! Part 1- Pilings In, Guardrails Gone!

A new mini marsh promenade is underway along Thatcher Road from Gloucester’s Good Harbor Beach entrance all the way around to the foot bridge. Walkers will have safe access via sidewalks and a natural path.

Gloucester has been planning for an opportunity to extend safer pedestrian access along Thatcher Road for years. When National Grid scheduled replacing antiquated gas lines along the busiest and scenic stretch, Gloucester Public Works was ready to seize the opportunity with collaborative solutions sensitive to conservation. Sidewalk upgrades were built out at both ends and paused until National Grid completed its underground infrastructure work. Prior to paving, Thatcher Road will be widened slightly to accommodate a safe and scenic path. The city hoped to complete repairs and paving by autumn and is on track to meet that goal. This week crews were clearing brush. The rusty guardrail was removed and will be replaced with a new design. “It will all happen quickly now,” says Mike Hale, director of Public Works.

 

Before marsh walk _Thatcher Road_Gloucester Mass_2018 June 19_future DPW work by great marsh ©catherine Ryan
BEFORE June 2018 ©catherine ryan

Rusty rail outta here_Thatcher Road slightly widened_pedestrian safe and access_great marsh back of Good Harbor_Gloucester Mass_2018 Sept 11 ©catherine Ryan

Thatcher Road Under Construction

There’s an ideal and creative scenic overlook solution over the river that’s under construction off site. I can’t wait for the reveal! I have been documenting progress and will post various updates, fast stats and history as another impressive project moves along.

New pedestrian walkway_Thatcher Road_Public Works_Gloucester MA_ 2018 Sept 11_©catherine ryan (1)

New pedestrian walkway_Thatcher Road_Public Works_Gloucester MA_ 2018 Sept 11_©catherine ryan (3)

Gloucester’s great marsh walk will afford safer access for sweeping seasonal observation

winter, spring, summer, fall 

 

One of my favorite Gloucester motifs, Gloucester oxbow, view from Thatcher Road 

Gloucester motifs_Gloucester oxbow_at the back of Good Harbor Beach_view from Thatcher Road_2017 Februray 5©c ryan.jpg

See amazing 1901 historic photos from Bruce Roberts: Gloucester crews worked on Haskell’s dam

City of Gloucester officials are working towards a Phase 3 for the Haskell Pond Dam reconstruction which I wrote about last week (Part 1). I included information about the original monumental build. In response, Bruce Roberts was kind enough to share these amazing photographs of the impressive crews at the Haskell Pond construction site 1901. Bonus: they were annotated by his grandfather in 1958.  West Gloucester families may recognize a surname or two, maybe a family resemblance. Please help ID if you can.

Bruce Roberts explains: “My grandfather, Edward F. Roberts, identified the individuals back in 1958.  There are some folks he didn’t recognize, since he would have been pretty young when these images were taken.  The first picture has the most identified individuals. One thing that has always been remarkable to me in the second image is how much Chester Andrews, my g-grandfather, resembled my father, Eugene Roberts, at that age.”

 HASKELL’S POND CONSTRUCTION ca.1901-02 – (Individuals ID’d by Edward Roberts in 1958)

Clearing Haskells pond late 1901 © courtesy historic photo collection Bruce Roberts

Photo 1, Dec 1901 (in snow): “Wood Choppers at Haskell’s Pond, December 1901”
Front Row, L-R: 1. Otis Lufkin, 2. Matt Poland, 3. Loren (sp?) Harris, 4. Melvin Wilkins, 5. Jim White

Back Row: 1.Asa Sargent, 2. unknown, 3. Ed Lufkin, 4. James Chadbourne, 5. Joseph Abbott, 6. unknown, 7. Joshua Roberts, 8 & 9. unknown

Clearing Haskells pond late 1901 © courtesy historic photo from collection Bruce Roberts

Photo 2 (late 1901 or early 1902):

Front, L-R: 1. Loren Harris, 2 & 3. unknown, 4. Asa Sargent

Center, w/ white shirt: Eps Walter Haskell

3rd row: (Right side, behind Asa Sargent, in light coat): Chester Andrews

(2nd to left from Chester Andrews): Fred Jeffs

2018 July 2 Haskells Pond Dam reconstruction Gloucester Massachusetts Department of Public Works directing SumCo_ photograph ©c ryan (4)

read more:

Continue reading “See amazing 1901 historic photos from Bruce Roberts: Gloucester crews worked on Haskell’s dam”

Great Public Works then and now | Haskell’s Pond Dam 2018 reconstruction with 1902 construction plans & wild origin story #GloucesterMA

Last month I was fortunate to glimpse the impressive Haskell’s Pond Dam reconstruction orchestrated by Gloucester’s Department of Public Works (DPW). Protecting and managing water utilities can be easy to take for granted. “This not so sleepy dam by Rt. 128 continues to deliver almost 30% of the city’s water,” exclaimed Larry Durkin, City Environmental Engineer. He explained that years ago the DPW team began assessing the city’s water infrastructure and compliance requirements including what would happen during an event storm. Haskell’s Pond Dam needed attention: The reconstruction was projected to cost 2 million (based on the preliminary plans and the recent Babson Reservoir repair). Phase I and II  were contracted out to SumCo Eco Contracting and the estimates were correct. The project cost two million and the work is largely completed thanks to grants and loans from the Massachusetts Executive Office of Energy & Environmental Affairs (EEA), and the Commonwealth’s Dam and Seawall Program.  DPW Director, Mike Hale, and Larry Durkin concur: “They are fabulous to work with.” Discovery was anticipated. While drilling it was determined that the Haskell Pond Dam was indeed not structurally stable, and a MAJOR fix would be required to bring the dam into compliance. The DPW team is working with the state to fund the critical work of Phase 3.

Until then, take time to enjoy its history. While checking out the 2018  progress, I pulled stories and stats from the Haskell’s Pond Dam original build In 1902. As with today, the dam work was regarded  a model project. State assistance and contracted elements were required then, too. The numerous links among these two century projects are a fascinating delve and described below. The evolving breaking news in 1902 kicked off with a bang, surprising lawsuits (next stop for one could be Supreme Court), and deft leadership. Readers and history buffs will recognize names. (Tarr ancestors were involved; were yours?)

panorama and contemporary photos – Like a mini Walden pond- Haskell’s Pond during Dam reconstruction Gloucester, MA ©c ryan July 7, 2018.  

2018 July 2 Haskells Pond Dam reconstruction Gloucester Massachusetts Department of Public Works directing SumCo_ photograph ©c ryan (1)

FAST STATS 2018 Phase 1 & 2 – $1,928,000

Scope for Phase 1 & 2: Construction of a new concrete spillway chute, concrete repairs, clearing of trees and unwanted vegetation and valve replacement at an earthen embankment dam within the City’s active water supply system, and more (A prior $175,000 grant from the state’s Dam and Seawall Program was awarded to support “engineering, permitting and the development of construction documents”  which established scope for Phase 1)

2018 July 2 Haskells Pond Dam reconstruction Gloucester Massachusetts Department of Public Works directing SumCo_ photograph ©c ryan (7)

Contractor: SumCo Eco Contracting,
Status: largely completed
Mayor: Mayor Romeo Theken
DPW Director: Mike Hale
City Environmental Engineer: Lawrence A. Durkin, P.E.
Project start (historic): 1902
Modern project start: 2013-18; RFP for Phase I issued: March 15, 2017
Total project cost: estimated to be $7 million
Funding Awarded to date: $1,925,000 

  • from State: $1,925,000 – The City has done very well with Grants and Loans from the MA Executive Office of Energy & Environmental Affairs (EEA), and its Dam and Seawall Program, Mike Hale and Larry Durkin concur. “They are fabulous to work with.”
No EEA Grant Loan Comment
1 Design  & permitting grant FY 2016 $175,000 Completed 6/30/16
2 Haskell Phase 1 Construction Grant FY 2017 $500,000 Closed 6/30/17 and City reimbursed
3 Haskell Phase 1 Construction Loan FY 2018 $500,000 Submission by DPW to EEA 7/26/18 for reimbursement
4 Haskell Phase 2 Construction Grant FY 2018 (Applied to Phase 1 change orders) $500,000 Submission by DPW to EEA 7/26/18 for reimbursement
5 Additional FY 2018 EEA, funds applied to Phase 1 change orders $250,000 Submission by DPW to EEA 7/26/18 for reimbursement
6 Haskell Phase 2 Full FY 2019 Grant, to be applied to Phase 3 $500,000 to be realized if Phase 3 goes forward in FY 2019
7 EEA Total to date $1,925,000 $500,000

Phase 3:  Some future phase was anticipated, though obviously impossible to nail down until Phase 1 & 2 were completed. The reconstruction was based on discovery put into works five or more years ago as Durkin and DPW team assessed city’s watersheds. The dam has been deemed unstable and will require a major fix to be compliant. According to Durkin, the scope for Phase 3 will include “a secant concrete wall to be drilled and concrete along the dam crest for its entire length, cored in the bedrock beneath dam for structural stability and a concrete parapet wall tied into the secant wall that provides the necessary containment for the maximum storm as defined by the state” and some exicting ancillary projects I’ll write more about in a future update. Phase 3 is estimated to cost 5 million and DPW is working on grants with the state to ensure that it happens.

Location(s): West Gloucester
Priority:  Mayor Romeo Theken’s Office-City consider water highest priority – this one continues to provide 1/3 of the city’s water

Before / After

before photos courtesy DPW ca.2014  /  after photos ©c ryan 2018

 

 

ORIGINAL 1902 PLANS AND PROPOSAL

Plate 14 West Gloucester showing Haskell's Pond_from Gloucester MA Dept Public Works archives

Reviewing the ordeal that was constructing the dam– one hundred and six years ago –is a fascinating read, and helped me appreciate the major job it’s been in 2018. The original dam construction was contentious and hence the top news story of 1902 and years prior. While researching its beginnings, I was struck by just how many areas of concern and themes of city governance from 1902 remain relevant in 2018. Here’s a short list: the financial condition of the city (“revaluation”), suitable allocations, considering work on Rogers Street, water costs, heroic solo sails, possible steel bridge over Annisquam, Burnham Field play ground, pros and cons of tourism, disagreement over what is considered sound development, new theater on Main Street, announcing state grants, eminent domain, boundary lines, Gloucester Fresh, cut bridge in bad condition, aiming to keep work in town when possible, Stage Fort Park tributes, environmentally friendly innovations,  sustainability, access and oodles of local politics-  Office of Mayor and City Council, city staff, committees, and commissions.

The excerpts below pertain to Haskell’s pond dam from 1902 Gloucester Daily Times  archives that I pulled from reels at Sawyer Free and transcribed for easy access.  Plans and maps are courtesy of Mike Hale and the Department Public Work team. Links to high resolution versions are provided at the end of the post.

January 4, 1902 – MAYOR FRENCH LOSES: Aldermen Vote to Exonerate Water Commissioners

Continue reading “Great Public Works then and now | Haskell’s Pond Dam 2018 reconstruction with 1902 construction plans & wild origin story #GloucesterMA”

Stacy Boulevard Part 7: expanded garden plans Tulip Fest May 6

IMG_20170504_052040Saturday May 6, 2017 is the official ribbon cutting re-opening of Stacy Boulevard by Mayor Romeo Theken. Thanks to the Mayor, Mike Hale and all Gloucester DPW, GZA, Essex County Landscape Assoc, Gloucester Community Preservation Act, Ann Giraldi Johnson, GFWA, Lieutenant Governor Karyn Polito, and groups like the Seaport Economic Council and Dir Carolyn Kirk, Department of Conservation and Recreation (DCR), Joe Lucido, Ed Parks, Mike Linquata, Donna Ardizzoni and One Hour at a Time Gang, Ringo Tarr, Bobbie Turner, YMCA and summer help, Wolf Hill, Generous Gardeners, and other volunteers!

Tulip Festival and bonnet parade Saturday 10AM

Ribbon Cutting 11:30AM

Party at Mile Marker Restaurant 6-10PM

Enjoy a closer look at the engineering and landscape plans for the expanded gardens and before/after comparisons.

IMG_20170410_103217 (1)

Stacy expanded gardens

IMG_20170503_151327  Continue reading “Stacy Boulevard Part 7: expanded garden plans Tulip Fest May 6”

Stacy Boulevard construction Part 5: rounded a big corner and an angle of repose

 

IMG_20161202_101325

 

INVISIBLE DETAILS UNDERFOOT AND RIGHT THERE

Earlier posts outline the engineering. The photograph above details the subgrade that was re-established for irrigation (note ditch alongside walkway), loam and sod. The photo also emphasizes the lengthy short wall on the right which was removed for access during construction. “The excavation was deep enough that the angle of repose was into the old wall.” The wall in the photo is rebuilt.

 

00001IMG_00001_BURST20161202101306_COVER

 

MEMORIAL BENCHES

Spacing and symmetry were important design considerations for Stacy Boulevard construction. The old benches were surveyed. Most were returned relative to where they were sited before the build out. The memorial benches on the boulevard are full. This one shows a tribute to Al Swelka.

 

IMG_20161202_094543

 

IMG_20161228_110253

00000IMG_00000_BURST20161202094911_COVER

Photos Nov-Dec 2016. Video caption: Stacy Boulevard construction minute – stroll before January, and sod.  Upcoming posts in this Stacy Boulevard series include: disasters, the cultural landscape, and Blynman. 

Series:

Part 4 – Gloucester’s majestic public works construction stats: bringing the Stacy Boulevard plans to life 

Part 3- Gloucester’s Stacy boulevard public works construction Part 3: compare high res plans from 1922 and 1923 with today

Part 2: Stacy Boulevard Public Works stunner | Gloucester is an early client for the Harvard and Olmsted trained landscape designer, Thomas Warren Sears. His 1908 photos are a must see!

STACY BOULEVARD NEARING THE FINISH LINE Part 1 – 

September 12 2016- Stacy Boulevard construction update: historic Blynman the Cut Bridge project scope plans and engineering details

August 2016 

Gloucester majestic Stacy Boulevard construction Part 4: public works bringing the plans to life

FAST STATS

Contractor: Newport, Nashua, NH, Brian McCabe is the Project Manager
Status: in progress
Progress April 2017: nearing finish line
Project start (historic): pre 1900
Modern project start: 1999
Funding Awarded: 2013

  • from State: $5,600,000 Seaport Advisory Council
  • from City: $1,120,000 + contingencies
  • Funding in place: 2015
  • Gloucester seawall grants over the last 18 years include: Cripple cove/ Robinsons landing; small sea wall by beacon marine and pirates lane; fort square; Stacy (Stage Fort through Blynman); plus emergency work on Blynman collapse

Bid Open and contract amount: 2/24/15 approx $7 million
Contract completion: on schedule, estimated spring 2017
Locations: Stacy Boulevard and Blynman
Priority: Top Level! Unique and exceptional project– Mayor’s Office considers seawall boulevard a priority necessity, for safety, a centuries infrastructure project with immeasurable quality of life benefits for residents and visitors and essential to economy
Temporary work site chain link fence: Required. The chain link fence is installed by the contractor to protect the work zone and define it better.
Tender house at Blynman and bridge: These are State not city/DPW purview. The new bridge house is temporary (thankfully). The entire bridge needs to be replaced and when it is a new tender’s house will be constructed. I will write more about the bridge house and Blynman in other posts.
Local jobs scroll below

IMG_20161202_095731

photo above: fencing subcontractor on a beautiful work site readying for railing. Railing required diamond coring like old granite quarrying. Stacy Boulevard December 2016. 

IMG_20161202_094837

photo caption: Railing! 2000 feet of new galvanized railing. (The replaced railing was not galvanized. DPW replaces railing: it’s simply a matter of funding.)

IMG_20161202_100234

photo caption: Alex Karp – GZA Field Engineer Boulevard construction. The GZA company acquired (David) Vine Associates. GZA is the design engineer for the boulevard project.  David Smith at GZA (formerly Vine) has worked with Gloucester since 1999. 

IMG_20161202_093910

photo caption: Gloucester’s DPW construction along the Boulevard

IMG_20161202_093606

photo caption: CAP STONE! It’s more than decorative. It has two exposed sides that need to be trimmed to look perfect. Mike Hale, Boulevard construction, November (of course note beard) 2016

IMG_20161202_093005

photo caption: Stacy Boulevard contruction capstone and harbor

IMG_20161202_093354

photo CAPtion!: Stacy Boulevard dazzling dizzying scope of ocean and capstone as far as the eye can see

IMG_20161202_102206

photo caption: Mike Hale with Brian McCabe, Project Manager, Newport construction, November 2016, Gloucester Boulevard

LOCAL JOBS

Along with the Mayor’s office and current administration, Gloucester’s DPW and Newport Construction work with subcontractors including local ones such as:

GZA – national with corporate headquarters in Norwood, MA – Engineering

Gloucester Transit Mix Concrete, Gloucester, MA,  – huge part of project!

Cape Ann Stone, Rockport, MA, Bruce Johnson (owner) – granite

MBT Electricians, Gloucester, MA –  electrical and lighting

Essex County Landscaping, Gloucester, MA, J D Aspesi (owner) – irrigation and sod

Anne Gilardi Johnson –  additional new gardens, site and landscape design for the Boulevard (building upon the successful Gloucester Fishermen’s Wives Memorial)– Johnson , a Gloucester native and multi award winning landscape architect, was commissioned by the Fishermen’s Wive Memorial board back in 2000 to design the landscape for Morgan Faulds Pike bronze sculpture, dedicated August 2001. “A series of design plans, and finally a study model, was produced as part of an interactive process between the designer, sculptor, and the Gloucester Fishermen’s Wives Association.” Johnson is a member of the Boston Society of Landscape Architects (largest chapter of the national organization), “known for her design of urban spaces including parks, playgrounds, memorials and streetscapes in Boston,” Worcester, and Gloucester. Her award winning designs include Boston’s (James) Hayes and Childe Hassam Parks in the South End. Generous Gardeners is planting the new beds on the Boulevard: thousands of tulip and daffodil bulbs were planted by many volunteers last fall to bloom this spring!

IMG_20161202_093234

some prior posts:

April 2017 Part 3- Gloucester’s boulevard public works construction Part 3: compare high res plans from 1922 and 1923 with today

April 2017 Part 2: Boulevard Public Works stunner | Gloucester is an early client for the Harvard and Olmsted trained landscape designer, Thomas Warren Sears. His 1908 photos are a must see!

April 2017 nearing the finish line Part 1- 

September 12 2016- Stacy Boulevard construction update: historic Blynman the Cut Bridge project scope plans and engineering details

August 2016 

Gloucester’s Stacy boulevard public works construction Part 3: compare high res plans from 1922 and 1923 with today

Here are the original 1922 and 1923 plans from the Gloucester DPW archives for close inspection:

Gloucester MA DPW archives Proposed Sea Wall 19224 MB Gloucester MA DPW archives Western Avenue Highway 1923

The Gloucester Daily Times published a construction status for the Western Avenue Project on June 5, 1923. Necessary delays were explained and some of the work would not be ready for Gloucester’s tercentenary celebration. The column indicates that the bridge house would be moved across the street–which didn’t happen then, but is happening in 2017– and mentions the state’s involvement.

“Work on Sea Wall Completed”- June 5 1923 update

Work on the construction of the new Western avenue seawall as far as the state is concerned, is practically completed and the lighters which for several months past have afforded great interest in many spectators have been withdrawn from the job…

On the western end of the park, the wall which held up the little park known as Marine Park is being capped with a four-foot cement topping, to bring it level to and joined with the new wall just completed from that point easterly toward Morgan’s store

Although hopes had been held out that the entire boulevard could be completed in time for the celebration, doubts are expressed now if this can be brought to a conclusion because of the large amount of work to be done, such as filling in behind the wall just erected, and the laying out of the street. Before the street can be laid out, time must be allowed for the settling of the rock filling, thousands of tons of which are to be dumped behind the wall, and this, it is now believed by those in charge, will not be ready for surfacing until spring (1924) at the least.

The bridge-house and the small shed alongside of it are scheduled to be moved to the other side of the street so that an unobstructed view of the boulevard from The Tavern to…

 

IMG_20161202_100614 (1)

00000IMG_00000_BURST20161202094911_COVER

Walk this way: Gloucester’s stately Stacy Boulevard public works project is breathtaking and one for the ages! Part 1

This view will be changing imminently! Today’s Motif Monday is the work on the Boulevard.

IMG_20170324_080151

The marvelous engineering and construction for the boulevard is a HUGE story. In all the collective excitement to walk this way, let’s remember to take a moment to acknowledge this feat.

IMG_20161202_094128

Mike Hale, Gloucester’s Director of Public Services, was hired in July of 1999, the very same year that this ambitious boulevard infrastructure planning and funding search began for this project. It was funded in 2014.  That means the current project timeline spanned 4 Mayors, administration, staff and city councils. The construction has been exceptionally well managed and I predict it will be or should be nationally recognized with awards. I have been documenting the progress and in the coming days will post several tributes, contemporary views, historic photos and background to rev up anticipation and respect.

Coincidentally, April 16, 2017 will mark the 94th anniversary of an important piece of the boulevard’s construction.

On that day in history, Gloucester’s city council approved the purchase of two lots, the Grant and Low properties:

“Whereas it is the desire of the board of park commissioners of the city of Gloucester to take in fee by purchase or otherwise certain land in said Gloucester lying between Western Avenue and the sea,

“And whereas, the said board has estimated the expenses of acquiring the same to be $8000,

“It is hereby ordered that the sum of $8000 be and hereby is appropriated from the $90,000 Western Avenue act of 1922 to the board of park commissioners as provided by law for the purpose of acquiring and laying out as a public park such land as the said board of park commissioners consider desirable therefore, being the land as shown on a plan entitled ‘Proposed taking for highway and park purposes, Gloucester, Mass, dated April 16, 1923, John H. Griffin, City Engineer,’ having reference to that portion as shown on said plan as is proposed to be taken for park purposes.” I’ve added the bold emphasis to note the big vision of Western Avenue as a public park and extension of Stage Fort in 1923.

The significant original investment was tangible and long lasting, hallmarks of any successful public works project. Did the Boulevard improve the quality of life in Gloucester? It wasn’t easy. Houses and roads were moved.

IMG_20170403_113225

Photo caption: “A VIEW NOW OF THE PAST. Most of us are familiar with the Above View. it Shows the Dwellings which Once Lined the Western Avenue Waterfront Before Work was Started Constructing the New Boulevard.”

These photographs were published in August 1923 and retrieved from the Gloucester Daily Times microfiche reel at Gloucester Lyceum & Sawyer Free Library.

The caption below describes Kent Circle “where grand stand has been erected for the review of the parades” for Gloucester’s tercentenary celebration. 

IMG_20170403_113218

Awaiting full access in 2017 is a mere blip of an inconvenience when considering how fundamental the Boulevard is for Gloucester. Its benefits are priceless.

Tomorrow’s post BRINGING PLANS TO LIFE

Prior posts