Last time Bertoni, York and Foley Road sewer work done, Rt. 128 was coming in. See the original A Piatt AndreW Bridge plans Circa 1950 #PublicWorks #GloucesterMA DPW

With thanks to Mike Hale, Dir. Public Works; Matt Coutu, Civil Engineer with New England Civil Engineering thru DPW; and Police Sergeant Conners.

At this time in July, Gloucester Public Works is generally midway into a construction season. Not this year. The rain has caused a “knotted web of deficiencies,” impacting routine work such as patching and pothole repair, outside painting, line & crosswalk painting, and summer paving which is “weeks and weeks behind”. Mowing wet grass or while it’s raining isn’t a good idea. And when the sun comes out the grass takes off. So that’s a visible delay. Still, DPW is plugging away at smaller projects around town, at the waste water plant, and pumping station projects. Most Utility work is on schedule.

Even before all this rain, the 2021 schedule demanded flexibility. DPW projects are unseen in the best of times, and can go unrecognized. Gloucester DPW worked through the pandemic. People forget that they were essential services. Prioritizing projects has been key (think critical events as in hazards or special events downtown). Also pacing and flexibility:

“The past 18 months have been taxing on these guys. Mistaken belief still out there that everyone had quarantine off. They need vacation this year. Didn’t get it last year. I’m mindful of burnout. So at times we’ll be short. Could be a specialty, supervisory, labor or machine operator job. They’re all important. The edges may be where you start assembling puzzle pieces, but you’re still going to need the outside and center pieces to be complete.”

Mike Hale, Dir. Public Works, July 2021 addressing holes if any in DPW operation

Essential workers, dangerous jobs – lest we forget | TRENCH BOXES — akin to mine shaft collapse prevention — for utilities and road work

Bertoni neighborhood water & sewer project 2021

Gas, sewer, and water lines have all been removed, redirected and replaced. Clay tile pipe (sewer) is notorious for ground water intrusion, and cast iron (water) for tuberculation*– New PVC will increase run time and water quality.

  • I had to ask. *TUBERCULATION: “Accumulation of minerals inside pipe decreases volume and impacts water quality.”

DPW is pumped about the new pump!

The former configuration ran beneath Rt. 128. Now that it’s been re-directed and running to a newer location off Poplar/DPW campus, there will be a significant savings both for the life of the pump and electricity.

“The Gloucester Ave. sewer pump station, during wet weather and high ground water, would run in excess of 12 hours per day, some days even longer. Running time for the newer one has been cut down to 6 hours a day.”

Mike Hale

Looking Back – February 1947

The Gloucester 2.5 mile highway construction was delayed “indefinitely”, because the bids for the approach (to a new bridge across Annisquam River) came in too high. The lowest bid was $1,285,776 and the cost was fixed at $300-$500,000.

August 1950

“…Much to the joy of thousands of beleaguered year-round and Summer residents, it was announced that the gap in the new high level bridge over Annisquam River was closed at 9a.m. by Bethlehem Steel Corporation.

The great significance was that it meant that it will not be too long before auto traffic will be flowing over this this improved entrance and exit to Gloucester, eliminating the two mile long traffic jams that have brought despair to motorists caught in the frequent openings of the low level Richard Blynman Bridge over the same river.

A sense of joy and relief was also experienced by the two Bethlehem officials in charge of the superstructure contract–Construction Engineers John P. McGonigle and Charles L. “Lonnie” Stroble. For as the 52-foot long, 44 ton piece of steel known as the central arch rib, south side, was lowered into place, their worry was whether or not it would fit. It did. 100 percent… The entire bridge is 860 feet long…

The superstructure contract, let by the State Department of Public Works to Bethlehem Steel is for $1,232,479.90.”

Boston Globe, Aug. 1950

1958 – RT. 128 Construction

Boston Globe focus on Rt. 128 by K. S. Bartlett features Gloucester, Ma.

“Approximately $1 million a mile for 65 miles of the great three-quarter circle from Gloucester on the North Shore to the high speed interchange in Braintree where it will meet the Southeast Expressway coming south from Boston. Cost of the 65 miles, all competed or now under construction, is a bit less than $65 million. That covers land damages, engineering, planning and construction costs since Route 128’s start back in 1936.”

“Rt. 128 has earned name, “Avenue of Modern Industry”: Million Dollar a Mile Gold Road” by K.S. Bartlett, Boston Globe

photo descriptions:

“Contractors building the 1.7 miles of the Gloucester extension found huge rocks dropped by visiting glaciers tens of thousands of years ago. More than half a million tons of rock (many kinds and varieties of hardness and weight) plus earth and plain dirt have been taken out to make your driving easier. Her you’re looking at one of the tough spots during the last weeks of construction.”

“Want a bit of New England’s famed chowder? You’re at the right place. The Gloucester extension of Route 128 ends at Eastern Avenue in Gloucester and just around the corner is Fish-Pier at the head of the Inner Harbor.”

The approach to the bridge they dubbed “Rail Cut Hill”.

Original plans pre 1953, 1953, & 1954

Some of the homes date from this time. Department of Public Works, Gloucester, MA. Higher resolution PDF here – or lower resolution images below

ca. 1950 (scan from original)

1953

1954

2021 Bertoni neighborhood

Approximately 3 months project nearing completion (thanks to digging into standard clay rather than granite ledge). This week, the crews have reached the storm water drain reconfiguration stage.

View from Bertoni Rd. to RT. 128. Old clay sewer line deliberately closed 2021. Bertoni Rd. is a dead end street that originally connected to Gloucester Avenue (on the other side of the highway)

Salt Island Road | Brier (Briar) Neck neighborhood

In contrast, Salt Island Road, Brier/Briar Neck neighborhood took six months for similar work because of granite ledge and compact density.

1969 Great Building by architect Don Monell is a modernist beauty at 32 Dunham Road in Beverly (formerly Salem News) now available to lease

“…Coughlin said the building, which was built in 1969, needs to be updated but is in good shape structurally and will not be demolished. “It’s too good of a building (to demolish),” he said.”– John Coughlin Gateway Realty Trust quoted in Gloucester Daily Times, Paul Leighton article 1/7/2020

What a beautiful spot! The building was designed by architect Donald F. Monell for the  Beverly Newspaper Offices and Factory in 1968 (built 1969) and consolidated with the Salem News in 1995. Monell worked and resided in Gloucester Massachusetts and designed residential, public and busieness projects including the Gloucester Daily Times (1956), Newburyport Daily News buildings, Sawyer Free Library addition, and the Cape Ann Museum.

photos – winter views January 2020

photos: Spring views

Will Build to Suit (978) 768-4511

About the architect

Excerpt from a prior post I wrote about Donald F. Monell back in May 2019 with photos of extant designs both residential and commercial:

“Donald F. Monell ( 1917-2002) earned multiple degrees: Bowdoin (BS, 1937) , Royal College of Edinburgh (1938), Tekniska Hogskolan in Stockholm (KTH Royal Institute of Technology), and M.I.T. (MS in city planning,1941 and MS in architecture, 1950).  He was a research assistant in City Planning at M.I.T. (1940-41), and a Research Associate in solar energy at M.I.T. from 1949 to 1951. During World War II he served as a Captain with the 333 Engrs. S.S. Regiment in the US Army Corp of Engineers from 1942-46. Prior to setting up his own firm in 1952, he worked as a community planner in Tennessee and for various architectural establishments. His son Alex Monell said that his father declined positions with larger international firms. “He preferred working on a smaller one to one relationship with clients.” Monell’s tenure at M.I.T. coincided with I.M. Pei and Buckminster Fuller; Monell set up his eponymous business two years prior to I.M. Pei. I asked Alex if his father worked with architect Eleanor Raymond. She built her home in Gloucester and had similar interest in sustainable design. She is credited with designing one of the first solar heated houses in 1948 “I know he worked with Maria Telkes (who invented a means to store heat in melted crystals that stored more than water could) on one of their solar homes and now that I looked her up I see the home was designed by Eleanor Raymond! So they knew each other.”

Monell was licensed to practice in Massachusetts, New Hampshire and New York and was NCARB certified. He was a member of AiA and Boston Society of Architects. He served on Gloucester’s Civic Art Committee beginning in the 1960s. He was a trustee of the Cape Ann Symphony Orchestra, an incorporator of AGH and Cape Ann Savings Bank, and a Vice President of the Cape Ann Museum (then Cape Ann Historical Assoc.).  Monell’s office was located in the Brown Building, 11 Pleasant Street. His son remembers visiting his dad on jobs and admiring the hand made scale models. Local residents may recognize the names of Monell hires:  Kirk Noyes who preserved Central Grammar and other award winning developments, was a draftsman, and Craig Toftey helped Monell

Portrait of Lila and Don Monell ca.1951_at Sarah Fraser Robbins home_Gloucester MA_courtesy scan from historic photo.jpg
Don Monell and Lila Swift should rightly be included on any Massachusetts #MassModernism trail. courtesy image: portrait of Lila and Don Monell ca.1951 at Sarah Fraser Robbins (photographer unknown)

Don Monell and Lila Swift, co-founders and collaborators of their own wrought steel furniture design firm in 1950, Swift & Monell, husband and wife, architect and artist, were the Charles and Ray Eames* of Gloucester for a time.  Original examples of their woven leather, metal and enamel stools, tables, and bins are rare and placed in collections. The furniture was exhibited at Current Design (now ICA) and Furniture Forum. They operated the business in upstate New York when Monell worked for Sargent Webster Crenshaw & Folley. They built a studio for their business in their home when they moved back to Gloucester in 1952. Initial prototypes and editions were inspired by touring Lawrence Mills with Monell’s brother in law, who worked in the textile industry.  Alex clarifies: “I do not know what mill my father’s brother in law was involved in or to what capacity, I just remember my parents toured it and found the source of leather. A Cambridge firm sold them for awhile. And later my parents gifted them as wedding presents to close friends and relatives. Ray Parsons a blacksmith from Rockport often made the frames and later I made some at Modern Heat.”

*footnote- Ray Eames in Gloucester: Before Hans Hofmann (1880 – 1966) settled into teaching in Provincetown, he was invited to teach summer classes at the Thurn School of Art in Gloucester, Massachusetts, in 1933 and 1934. Thurn was a former Hofmann student. Ray Eames studied painting with Hofmann in Gloucester and was a student of his for years.  Decades later (during an interview with Ruth Bowman, who I knew, was wonderful, and friends with Rita Fraad who had a great Hopper) Eames mentioned 1940, a later date, for when she first learned about Hofmann. On an architecture timeline-  Charles and Ray Eames were born in 1907 and 1912 respectively, and Monell in 1917. They were married about a decade before Monell & Swift and west coast rather than east. Yet they were contemporaries. Art & Architecture case study homes began in 1945 (Eames house, 1949) Eames lounge chairs were manufactured in 1956 (after years of prototypes). Gropius House in Lincoln , Mass., landmark Bauhaus residence now museum was built in 1938, same year as MoMa Bauhaus exhibition. The Graduate school at Harvard designed by Gropius was a TAC (The Architects Collaborative) build in 1950. TAC was founded in 1945 with the clout addition of Gropius who continued with the firm until his death in 1969. Original 7 founders were Norman FletcherLouis McMillenRobert McMillanBen Thompson,  Jean FletcherSarah Harkness and John Harkness. Twenty years later, Monell’s Plum Cove elementary school design in 1967 was leveraged by partnering with The Architects Collaborative. Gloucester’s Plum Cove school is a TAC build. Wikipedia lists several commissions. The school could be added…”

DON MONELL ARCHITECT_ Plum Cove school and grounds_built in 1966_ Gloucester MA_ lovely gentle winding path approach through nature_20190523_©c ryan

Read my full piece here  and see more examples of his buildings. “Many of his commissions are heavenly sites where buildings serve the surroundings,  whether built or natural.”

February 26, 2018 Gloucester Daily Times

Writing for the Gloucester Daily Times, Paul Leighton wrote that Salem News was looking for a new space because the operations no longer required such a big building.  Various production and departments had already been relocated by this time. You can read the full February 2018 story here. The article mentions that it’s a 60,000 square foot property. Recent descriptions indicate that it’s 37,000+. I’m not sure why; perhaps, the greater figure encapsulated the grounds.

2019 Commercial listing description

“32 Dunham is a 37,502 square foot building on 6 acres of land. Zoned for industrial, research and office, with high visibility on route 128. Less than 30 minutes from downtown Boston and Logan airport.” 

January 7, 2020 Gloucester Daily Times

Salem News moving to Danvers article by Paul Leighton Staff Writer about the status of the building now

excerpts:

“The Salem News is moving out of its longtime home in Beverly and heading to a new location in Danvers. The newspaper will move into its new office suite at 300 Rosewood Drive in Danvers on Sunday, according to Karen Andreas, regional publisher of North of Boston Media Group, which includes the Gloucester Daily Times.

“The Salem News has been located at 32 Dunham Road in Beverly since merging with the former Beverly Times in 1995. The company moved its press and printing operations out of Beverly years ago and consolidated several other business functions, such as the finance and customer service departments, in the North Andover offices of its sister paper, The Eagle-Tribune. Therefore, Andreas said, the Salem News no longer needs a building of that size.

“This building is 37,500 square feet, and way too big for us,” Andreas said. “It doesn’t make sense for us operationally.”

“Gateway Realty Trust of Essex has signed a purchase-and-sale agreement to buy 32 Dunham Road. John Coughlin, a project manager for Gateway Realty, said the company plans to preserve the building and lease it.

“Coughlin said Gateway does not have a tenant lined up yet but said the building, which has a mix of office and warehouse space and more than 100 parking spots, would be good for many types of businesses.

“Ideally it would be one tenant that would want to take the whole building, or we can sub-divide it,” he said. “It lends itself to a lot of potential users.”

“…Coughlin said his company, which owns several buildings on the North Shore, was attracted to the building due to its location next to Route 128. Dunham Road has been the site of several new office complexes built by Cummings Properties as well as a new manufacturing headquarters built by tech company Harmonic Drive. The road is also home to North Shore Music Theatre.

“…The Salem News building, which includes six acres of land, was listed for sale at $3.5 million. 

 

Cape Ann Museum’s new satellite location opening June 2020 #GloucesterMA

From Washington & Poplar streets, progress views (2018-2020) across to the Cape Ann Museum expansion. This spot includes the historic White Ellery House and Barn, Babson-Alling home, new archives & collections building, and public space and grounds. The museum’s anchor location is nearby on Pleasant Street in downtown Gloucester.

 

Apri 2019 / Nov 2019

 

Jan 2019 / Jan 2020

 

Nov 2018 / Jan 2020

 

sign announcing Cape Ann Museum expansion_Gloucester Mass_20200114_©c ryan

 

Sun Sets in Peabody (not “on”)

Not to panic, I was a passenger on this journey down Route 128 / I-95 . Traveling on the way to Reading for the Manchester Essex field hockey game and I got to watch a changing sky almost all the way.