Fill rake and roll- next steps in the Long Beach seawall storm repair

What a stunner day for the next phase of the Long Beach seawall repair. They’re loading and raking in fill to level the walkway today. Roller still to come.

next phase in Long Beach seawall walkway repair_ that's a lot of fill_20180622_083235

speedy backing up

this way and that still to come

 

 

2 thoughts on “Fill rake and roll- next steps in the Long Beach seawall storm repair

Leaving a comment rewards the author of this post- add to the discussion here-