Long Beach walkway construction chugging along, and no dogs until Sept. 15th Posted on June 19, 2019June 19, 2019 by Catherine Rate this:Spread The GMG Love By Sharing With These Buttons:Tweet Click to email a link to a friend (Opens in new window) Email Click to print (Opens in new window) Print Click to share on WhatsApp (Opens in new window) WhatsApp Pocket Click to share on Reddit (Opens in new window) Reddit Like Loading... Related Published by Catherine posted content / cell phone photos mine, unless otherwise credited (thumbnail portrait of Catherine at MFA, Boston © David Cox photo) https://www.cryanaid.com/ View all posts by Catherine
Repaired the boardwalk with asphalt? Kiddos feet are sure to burn! Cheap repair people! LikeLike Reply
Sorry about the poor photo–it’s not asphault. They’re continuing the application they completed last year. (Runners and walkers remark that it’s easy on the feet.) Thanks so much for reading and adding in. I’ll edit up top and clarify the materials. LikeLike Reply
Repaired the boardwalk with asphalt? Kiddos feet are sure to burn! Cheap repair people!
LikeLike
Sorry about the poor photo–it’s not asphault. They’re continuing the application they completed last year. (Runners and walkers remark that it’s easy on the feet.) Thanks so much for reading and adding in. I’ll edit up top and clarify the materials.
LikeLike
That’s nice to hear Catherine. thank you for clearing that up.
LikeLiked by 1 person