Town Begins to shore up Long Beach seawall, by Michael Cronin, Gloucester Daily Times

Plenty of prior GMG posts (search “Long Beach seawall”); here are a few:
REPAIRING LONG BEACH ROCKPORT MASS AFTER STORM DAMAGE|BUSY NEW ENGLAND DPW CREWS April 2018
Seawall damage coverage GMG post May 25, 2018
FILL RAKE AND ROLL- NEXT STEPS IN THE LONG BEACH SEAWALL STORM REPAIR June 2018
Thanks Catherine.
Best wishes for this effort…
I have friends who work construction and engineering from active duty days.. The shifting ground and washout can be very bad on this. We see this a lot during the big typhoons and heavy rains water will find it way around, underneath, or over if there are any cracks or holes topside the water will get in and cause serious damage also sinkholes, path least resistance!
Getting it in and set is key best of luck for this effort. Dave.
LikeLiked by 1 person