East end, middle, west end: there are phases of construction all along Main Street in Gloucester.
The goodlinens soft opening was pushed back; hopefully the doors will be ready to open July 15th. The space required lots of love.
And a couple of doors down?
The gallery and artist studios moving into the old Green Life space at 196 Main St and wrapping along Elm could be ready in August. The framing for the artist studios matches up with the windows.
What will go here, in the location by Short and Main and Cafe Sicilia?
Beau’s juicery shuttered after 11 months. Though she’s a nice girl, misguided to think Glo was ready to fork over $9-10 for a juice.
LikeLike