College students just want normal libraries Atlantic Magazine | Beautiful books and nooks

 

 

just a few photos of many beautiful libraries in Massachusetts (Boston, Gloucester, Quincy, Beverly, Middleton)

As do towns! The proposed new building (Dore & Whittier/Matt Oudens) related to the Sawyer Free Library is landing at the tail end of the visioning trend called out in this  Atlantic article by Alia Wong:

“College Students Just Want Normal Libraries: Schools have been on a mission to reinvent campus libraries—even though students just want the basics.” 

excerpts:

Likely in the hopes of proving that they have more to offer than a simple internet connection does, many college libraries are pouring resources into interior-design updates and building renovations, or into “glitzy technology,” such as 3-D printers and green screens, that is often housed in “media centers” or “makerspaces.”

“Yet much of the glitz may be just that—glitz. Survey data and experts suggest that students generally appreciate libraries most for their simple, traditional offerings: a quiet place to study or collaborate on a group project, the ability to print research papers, and access to books.”

So-called digital natives still crave opportunities to use libraries as libraries, and many actively seek out physical texts—92 percent of the college students surveyed in a 2015 study, for example, said they preferred paper books to electronic versions. (Plus, a growing body of evidence shows that physical books and papers are more conducive to learning than digital formats are.) The dean of learning and technology resources at one of the six campuses of Northern Virginia Community College (NOVA) recently told me about a student he had met: Upon learning that her campus library had only the e-book version of a text she needed to read, the woman opted to make the trek to another campus a nearly half-hour commute away that had the hard copy. A 2016 survey of students at  Webster University in Washington, D.C., also illustrates limited use of digital resources, finding that just 18 percent of students accessed e-books “frequently” or “very frequently,” compared with 42 percent who never used them.

“Duke University’s 2016 survey of its students drew similar conclusions, finding that book delivery was one of the most important services to students; fancy library services such as instant messaging or data-visualization help fell much lower on students’ priority lists. A separate, years-long project on community-college students by the NOVA dean and a team of researchers found that respondents “most often view the library as the service provider they would likely go to” for an array of bread-and-butter needs, such as help gathering research for a paper, registering for classes, or applying for financial aid. Demand for access to devices such as 3-D printers and virtual-reality headsets was relatively low; respondents tended to highlight the need for reliable Wi-Fi instead.

“Many college libraries are reinventing themselves, but perhaps they’re trying to fix an institution that isn’t, in fact, broken…”

https://www.theatlantic.com/education/archive/2019/10/college-students-dont-want-fancy-libraries/599455/

Rockport Library has dedicated quiet conversation and reading spaces as do Beverly, Quincy and Boston.

Historic District Commission meeting June 25: Sawyer Free Library’s new building presentation

City Hall Central Grammar Sawyer free_20190520_©c ryan.jpg

Historical District Commission meeting, Tuesday June 25, 2019 at 7pm

First informational review meeting to HDC: Sawyer Free Library, review of proposed renovation/addition and exterior concept design

SFL HDC.jpg

 

Sawyer Free Library | new building concept plans and rediscovering architect Donald Monell #GloucesterMA #ModernMass

This photo chronicle begins with scenes from the Gloucester Lyceum & Sawyer Free Public Library 2019 Annual meeting, including views of the concept proposal for renovation and addition intended for the library as they appeared in the feature presentation that evening with some brief analysis. The second part of the piece provides  background about the American architect, Donald F. Monell, and visual context regarding his designs for the library expansion built in 1973 and largely ignored through this current new build consideration. Links to several reference documents relevant to this process are collected and provided at the end. (This update is part of an ongoing series published on GMG.)

Annual meeting – Arriving/settling in

About 85 people including Trustees with guests, library personnel, and marketing and architectural representatives were present for the Gloucester Lyceum & Sawyer Free Public Library’s Annual Meeting on May 20, 2019. (click individual photos to see full size)

Introductions

Mayor Romeo Theken, Library Dir. Deborah Kelsey, and Trustee Chair John Brennan welcomed the public. Brennan thanked several Trustees for long service and welcomed new ones.

Award

Deborah Kelsey presented the Mary Weissblum Smith Volunteer Award to Susan Oleksiw and Christy Park in recognition of their curation and management of the Matz Gallery rotating exhibitions over the past five years and their notable careers. Ironically, in the new concept plans, there is no Matz Gallery and limited art space. Read more about Matz’s philanthropy and work in Gloucester here. The major works from the art collection continue to be off view and similarly unaccounted for in future plans.

Dir Kelsey presents M Weissblum Smith Award to esteemed Matz Gallery volunteers_SFL Annual meeting installation views_architect presentation_Gloucester MA_20190520©c ryan

Financial Statement YR 2017-18

The library’s treasurer explained that the Annual Meeting financial reports always illustrate the prior year rather than the one just completed. So for this 2019 annual meeting, the report reflects May 2017- May 2018. He explained next year’s will represent the year 2018-19 and will show red and depletion of the 6 million endowment. Former board members asked about expenses to date, related to the new build, and itemization of the Trustee expenses line item, which was not in use when they served. A trustee explained that a title more accurately reflecting those expenses would be helpful. Reports will be shared.

SFL annual meeting 2019.jpg

Architect’s renderings / Oudens-Ello (with Dore & Whittier for library and MBLC)

The 25 million+ quoted for the concept plan does not include preservation of the original heart and soul of the library, the Saunders building, or any mention of the library’s fine art. A recent estimate for potential Saunders preservation begins at 3 million– which would be in addition to any work done elsewhere with the library.

EXTERIOR addition added to Monell_view from fire station_architect presentation_SFL Annual meeting installation views_Gloucester MA_20190520 ©c ryan
View of a proposed addition to Monell (out back). The Saunders House will not be visible. This concept image is not precisely drawn–i.e. City Hall in situ is not captured accurately in this rendering.
Monell addition back and context surroundings_20170129_© c ryan
surrounding context for comparison with rendering above

back sawyer (1).jpg

Stairs and more stairs

3 story glass staircase larger than atrium now_View from Central Grammar renderings_architect presentation_SFL Annual meeting installation views_Gloucester MA_20190520 ©c ryan

Design inspiration did not come from Saunders or Monell. (I asked.) One of the stated goals was striving to continue to make the library accessible for all, although in my opinion since the first presentation years ago, this design undercuts that aim.

Because of gentle switchback steps, currently there is technically no “accessible for all” direct entry from Dale to the Main Floor, or from Middle Street. The accessibility option from Dale curves around to a side* and back entrance. If that level is not the destination, patrons continue to the elevator.

Increasing all of the buildings’ gateway capacities is a fantastic goal. I do not understand how a concept with such tremendous staircase emphasis will remedy that expression of accessibility for all, or ease patron flow. The monumental scale of the three-story glass central stairwell takes up the transition volume between the original Monell and concept addition, and looms larger than the current Monell atrium. In this concept, children’s and teen spaces will be on the top floor. Crowd flow of all ages will need to access the elevator from the ground floor near the back entrance. Once upon a time the children’s wing was on the top floor of the Saunders building and intentionally moved to a space on the ground level. Currently, children’s services is on the ground floor. Friends and librarians using Reading and Salem libraries are not fans of children’s spaces on the top floor.

*The side entrance was sealed off this year due to safety concerns which can be helped by architecture and staff. The new security officers received the biggest applause of the night.

Glass staircase design statements — stacked cantilevered and floating– are common features in malls, retail, and transportation (airports!) hubs, often with escalator options, and ample budgets for cleaning staff. They’re not super kid friendly or easy to clean. For this concept, the staircase massing can be greatly reduced and favorably impact the footprint, cost and siting. I’ve written about the odd flow of moving the library’s busy children’s services up to the top level in this proposal. Just one of Christy Russo’s daily programs may bring in 20 to 80 kids and their grown-ups!

Moving to elevator and stairs with or without strollers will increase flow inefficiency dramatically, and be a disservice to an evergreen and engaged population. Children’s could be flipped back to the ground floor, with or without a separate teen space on this level. Research and multi use rooms requested for “21st century programming needs” could be dispersed throughout the expanded upper levels. Safety issues and bathrooms can be addressed on any floor. The librarians have been patiently awaiting remodeling and interior update and upgrades on the ground floor since 2012. The build out goal of 2026 or later is too long!  They need more space, a functioning and better test kitchen, and major bathroom renovations (yesterday!).

Oudens Concept plan Timeline

ETA library tentative opening 2026

TIMELINE_architect presentation_SFL Annual meeting installation views_Gloucester MA_20190520 ©c ryan

SFL Library atrium, architect Donald F. Monell

Monell building, top floor, no artificial light, no filter: looking across atrium with presentation underway on Main Floor as this space was being described again as an uninviting dark hole.

Design inspiration and high bar – Saunders House and Monell

For nearly 190 years, the Gloucester Lyceum & Sawyer Free Public Library has played a key role in the cultural life of the city of Gloucester and the Commonwealth.  Gloucester Lyceum & Sawyer Free Public Library features not one but three iconic buildings. Investment in building projects with such inspiring history, pedigree, assets, materials and form are indeed a rare and enviable opportunity. Any library build should feature both Saunders and Monell. We are so lucky to have them!

There was worry about the Saunders and Monell buildings, the Stacks, and the Rando Memorial garden when the proposed new building first dropped and as this process continued. Thankfully, a Saunders stewardship committee has been reestablished and the Rando Garden will remain. (There was pushback that the “21st century building” left the community with less green space, not more.)  It’s only since last week that razing Monell was taken off the table. And it’s only since February 2019 that the architects began to emphasize green design as they had not realized how valued such criteria was in Gloucester. A workshop was held at the library.

Still, no one involved in the new process was discussing Monell, his inspiration, or influence. Regarding the library 2019 green visionaries—Monell may be more important to them than they realize. After all, he was ahead of his time incorporating wind and solar design into public buildings and homes. I’ve been thinking more and more about Monell, his studies and business ventures, his devotion to Gloucester.

Donald F. Monell earned multiple degrees at Bowdoin (BS, 1937) , Royal College of Edinburgh (1938), Tekniska Hogskolan in Stockholm (KTH Royal Institute of Technology), and M.I.T. (MS in city planning,1941 and MS in architecture, 1950).  He was a research assistant in City Planning at M.I.T. (1940-41), and a Research Associate in solar energy at M.I.T. from 1949 to 1951. During World War II he served as a Captain with the 333 Engrs. S.S. Regiment in the US Army Corp of Engineers from 1942-46. Prior to setting up his own firm in 1952, he worked as a community planner in Tennessee and for various architectural establishments. His son Alex Monell said that his father declined positions with larger international firms. “He preferred working on a smaller one to one relationship with clients.” Monell’s tenure at M.I.T. coincided with I.M. Pei and Buckminster Fuller; Monell set up his eponymous business two years prior to I.M. Pei. I asked Alex if his father worked with architect Eleanor Raymond. She built her home in Gloucester and had similar interest in sustainable design. She is credited with designing one of the first solar heated houses in 1948 “I know he worked with Maria Telkes (who invented a means to store heat in melted crystals that stored more than water could) on one of their solar homes and now that I looked her up I see the home was designed by Eleanor Raymond! So they knew each other.”

Monell was licensed to practice in Massachusetts, New Hampshire and New York and was NCARB certified. He was a member of AiA and Boston Society of Architects. He served on Gloucester’s Civic Art Committee beginning in the 1960s. He was a trustee of the Cape Ann Symphony Orchestra, an incorporator of AGH and Cape Ann Savings Bank, and a Vice President of the Cape Ann Museum (then Cape Ann Historical Assoc.).  Monell’s office was located in the Brown Building, 11 Pleasant Street. His son remembers visiting his dad on jobs and admiring the hand made scale models. Local residents may recognize the names of Monell hires:  Kirk Noyes who preserved Central Grammar and other award winning developments, was a draftsman, and Craig Toftey helped Monell with the Sawyer Free library.

The new building planners describe the need for a 21st century library. What does that mean today? Back in 2012, technology was the big discussion point and the library a possible tandem option for schools. (Elementary school libraries were shuttered and/or volunteer run, and school librarian positions cut.) Since then, libraries in schools became “Learning Commons” with a tech focus. By 2019 Gloucester Public Schools have a 1 to 1 student computer initiative. There was a desire for grounds improvement, since completed and well received with the Rando Memorial. I was asked about helping with a public art comission and how it might work as a play structure, too. Mayor Romeo Theken reminded us of the homes and neighborhood playground where the Monell addition and parking lot were built. Community input suggested opportunities for more outdoor spaces would be welcome, not less. Library design trends recommend co-work and makerspace options so the library is a community center. (Sawyer Free has been a community center since its founding.)

One thought regarding “21st Century” library tech goals: partnerships with M.I.T., Harvard, and Bowdoin could be fruitful and shored up by honoring Monell. Perhaps they’d help facilitate subscriptions to specialized libraries. Coordinating public access to resources like MatLab as one example would enhance “accessibility for all” in a 21st century sort of way.

Monell’s son, Alex, shared a section from M.I.T. President’s Report, 1951, with a reference to his father: “Mr. R. Buckminster Fuller, visiting lecturer, who contributed significantly to this conference, worked this year with the third-year students in architectural design and presented his concept of the “comprehensive designer” in a program emphasizing the relation of structure to design. In August, I950, occurred the five-day symposium on “Solar Energy for Space Heating,” under the auspices of the Godfrey L. Cabot Fund, attended by about 900 persons who were mostly visitors to the Institute. Mr. Donald F. Monell, research associate, was responsible for organization. Speakers included staff members and outside authorities in this field. Professor Lawrence B. Anderson was one of the contributors.”  

Don and Lila Monell could be the “Charles and Ray Eames of Gloucester”

Portrait of Lila and Don Monell ca.1951_at Sarah Fraser Robbins home_Gloucester MA_courtesy scan from historic photo.jpg
courtesy image: portrait of Lila and Don Monell ca.1951 at Sarah Fraser Robbins (photographer unknown)

Don Monell and Lila Swift should rightly be included on any Massachusetts #MassModernism trail. Monell and Swift, co-founders and collaborators of their own wrought steel furniture design firm in 1950, Swift & Monell, husband and wife, architect and artist, were the Charles and Ray Eames* of Gloucester.  Original examples of their woven leather, metal and enamel stools, tables, and bins are rare and placed in collections. The furniture was exhibited at Current Design (now ICA) and Furniture Forum. They operated the business in upstate New York when Monell worked for Sargent Webster Crenshaw & Folley. They built a studio for their business in their home when they moved back to Gloucester in 1952. Initial prototypes and editions were inspired by touring Lawrence Mills with Monell’s brother in law, who worked in the textile industry.  Alex clarifies: “I do not know what mill my father’s brother in law was involved in or to what capacity, I just remember my parents toured it and found the source of leather. A Cambridge firm sold them for awhile. And later my parents gifted them as wedding presents to close friends and relatives. Ray Parsons a blacksmith from Rockport often made the frames and later I made some at Modern Heat.”

*footnote: Ray Eames was in Gloucester. Before Hans Hofmann settled into teaching in Provincetown, he was invited to teach summer classes at the Thurn School of Art in Gloucester, Massachusetts, in 1933 and 1934. Thurn was a former Hofmann student. Ray Eames studied painting with Hofmann in Gloucester and was a student of his for years.  Decades later (during an interview with Ruth Bowman, who was wonderful, and owned a fabulous Gloucester Hopper) Eames mentioned 1940, a later date, for when she first learned about Hofmann. On an architecture timeline-  Charles and Ray Eames were born in 1907 and 1912 respectively, and Monell in 1917. They were married about a decade before Monell & Swift and west coast rather than east. Yet they were contemporaries. Art & Architecture case study homes began in 1945 (Eames house, 1949) Eames lounge chairs were manufactured in 1956 (after years of prototypes). Gropius House in Lincoln , Mass., landmark Bauhaus residence now museum was built in 1938, same year as MoMa Bauhaus exhibition. The Graduate school at Harvard designed by Gropius was a TAC (The Architects Collaborative) build in 1950. TAC was founded in 1945 with the clout addition of Gropius who continued with the firm until his death in 1969. Original 7 founders were Norman FletcherLouis McMillenRobert McMillan, Ben Thompson,  Jean FletcherSarah Harkness and John Harkness. Twenty years later, Monell’s Plum Cove elementary school design in 1967 was leveraged by partnering with The Architects Collaborative. Gloucester’s Plum Cove school is a TAC build. Wikipedia lists several commissions. The school could be added. 

Swift & Monell.jpg

The Monells were friends with many artists and Gloucester residents. They were best friends with Sarah Fraser Robbins which is another rich “green” connection for Sawyer  library. The Monells were married at her house and living there when their first son came home! Eventually they built their dream home in Gloucester designed to maximize its stunning  natural setting, all granite and ocean views. Their family and business grew. Lila’s art and home are inspired by wild nature, especially birds and insects, often the subject of her prints and photographs, and even wardrobe embellishments.  (More than one person recalled a striking faux brooch or embroidery like adornment that was actually a coiled live centipede.) Domestic animals and wild birds were part of the family. There were always pet crows and birds. “Our mother raised geese and guinea fowl,”  Alex continued, “Mainly the birds we had were ones she brought to rescue from oil slicks and other calamaties. She was well known as someone to bring an injured bird to.” Lila wrote an article in the Mass Audubon newsletter about two cormorants which she had a permit to raise.  “Sarah (Fraser Robbins) had an old lobster boat, never used as one.” Alex recalled. “They used it for fishing. Our families were quite close. We’d head to Norman’s Woe and bring back seagulls. You know, rescue babies, and help teach them to fly.” He said he got them comfortable being tossed like a glider. “They’d come back again and again ready to launch!” It was easy to imagine some glimpse of his childhood in this idyllic setting. His delight brought to mind My Side of the Mountain by Jean Craighead George and Driftwood Captain by Paul Kenyon. Sea and stone. What a playground!

Monell residence Gloucester Ma
courtesy photo:  Don and Lila Monell family residence (ocean side), Gloucester, MA [Architect Donald F. Monell]

Donald F. Monell Architecture

Monell completed many commissions in Gloucester and elsewhere on the North Shore, New Hampshire and New York. Any renovation and remodel at Sawyer Free is an incredible chance to celebrate his work and honor his legacy. After considering examples of Monell’s architecture it is easy to find his personal design in the work he did at Sawyer Free Library. He was trained as a landscape architect as well which helps to imbue his projects with great sensitivity and gentle passages. Many of his commissions are heavenly sites where buildings serve the surroundings,  whether built or natural. His designs are better because of this reverence for context.

(Note on images- double click to enlarge)

Monell architecture – Residences

Monell designed numerous private residences and additions [e.g. Dotty & Lawrence Brown (1957), Laight (1958), Despard (1959), Boyce (1961), Foster, Nydegger, Marietta Lynch, Judy Winslow, Bob and Libby French (1967), Featherstones, John Hays Hammond Jr, and Phil Weld (many)] in Massachusetts, New Hampshire and New York. Several clients were repeat customers. The Brown home is one example. Alex writes that “the residence was altered by my father in the late 70s to accommodate a library when they moved there year round.”  Much of the big collection of books were cookbooks. “Dotty was a great cook and good friends with Julia Child.”

2015 realtor images
photo: ocean side_Donald F. Monell architect, Gloucester, Mass. 1957 commision; and below photo comparison of back same residence ca. 2015/2019 ( seawall, cladding modified since Monell)

Gloucester Mass home_Architect Donald F Monell commission_later interior library addition_ views 2015 vs 2017

stilt house kidney pool grounds_Donald F Monell architect_highly modified since commission_Gloucester MA.jpg
then/now photo: Residence (stilt house) designed by Donald F. Monell, Gloucester, Mass. (modified since Monell)

Within a few short years of moving to Gloucester, Robert and Elizabeth ‘Libby’ French expanded their art collection, he was elected Mayor, and they commissioned Monell to design their home and property in 1967.  caption: video shows interior/exterior and was published in 2016. I don’t know when it was filmed. Small lovely moments – note the interior staircase railing, and exterior deck and bridge to glacial boulders. Clearly some modifications since it was designed in 1967 and perhaps since this video.

Monell architecture  – Public Buildings

Besides the Gloucester Lyceum & Sawyer Free Public Library commission, Monell government and public buildings include the Beverly Newspaper factory and offices, Eastern Point Retreat, Plum Cove School, and the Cape Ann Historical Society. Elements of his signature architecture resonate strongly with the work he did at the library.

Eastern Point Retreat House, Dorm & Dining Halls 1960

For the Gonzaga project, Monell joined two buildings and built a cafeteria and dormitories. Recently his original work at the entrance, connector and dormitories was razed. The historic photos BEFORE illustrate his artistry and display a strong connection with the design Monell established at the front of the library on the stacks building between Saunders and the expansion.

Hall to dorm sadly gone
(courtesy photo) BEFORE: Detail showing Monell’s work at the Gonzaga retreat former connector and gateway heading on the left to the cafeteria (still standing) and to the right to the dormitories (remaining though greatly altered). The compelling double bells and arches, poetry pause in architecture, were subsumed by the most recent build out.
BEFORE eastern point retreat double bell double arch Monell connector so poetic
(before- subsumed with remodel ca.2017)
New construction circa 2017 subsumes some of Donald J Monell architecture_Eastern Point Retreat_Gloucester Massachusetts_20190521_© c ryan (1)
AFTER: renovation/expansion circa 2017 (Monell additions subsumed and/or altered)

BEFORE / AFTER – dorm, far left (ocean side)

new dormitory construction circa 2017 altered Donald J Monell addition_Eastern Point Retreat_Gloucester Massachusetts_20190521_© c ryan.jpg

BEFORE / AFTER – dorm (parking side)

Microphone were set up to amplify sounds of the ocean (white noise) within the dormitory

BEFORE /AFTER – cafeteria low glass ceiling (ocean side) remains

New construction circa 2017 subsumes some of Donald J Monell architecture_Eastern Point Retreat_Gloucester Massachusetts_20190521_© c ryan (7)

Plum Cove Elementary School 1966

Monell subcontracted/collaborated with TAC for build

DON MONELL ARCHITECT_ Plum Cove school and landscape design_built in 1966_ Gloucester MA_20190523_©c ryan _073333

Beverly Newspaper Offices and Factory (now Salem News)

public entrance_gentle poetry_DONALD F MONELL_architect _Beverly Times Newspaper Plant and Offices_1969_ now Salem News_20190524_©catherine ryan (8).jpg

PANO_studied grace_public entrance_DONALD F MONELL_architect _Beverly Times Newspaper Plant and Offices_1969_ now Salem News_20190524_©catherine ryan (8).jpg

wild friend wild respite.jpg
A local resident swooped from nesting (near the roof?). Monell’s design nearly a wildlife refuge. What a beautiful spot! He designed the Gloucester Daily Times (1956) and the Newburyport Daily News, too

Gloucester Daily Times (1956)

side_Gloucester Daily Times newspaper offices built 1956_architect Donald F. Monell_photograph © c ryan May 2019 (5)

Cape Ann Museum (formerly Cape Ann Historical Society) 1968

CAM_20181219_c ryan

Circa 1967 plans for property by Grant Circle

Monell Cape Ann Historical Museum proposal predates eventual Pleasant Street addition Gloucester MA long before 2019 Grant Circle work
courtesy photo: Cape Ann Museum work by Grant Circle is underway, but consideration of that space began decades back. Here’s Don Monell’s illustration related to a  proposed campus for Cape Ann Historical Center by Grant Circle. At the same time he was asked for concepts related to the Pleasant Street addition which is ultimately the direction the museum went at that time (1968).

Cape Ann Savings Bank

Monell’s work at Cape Ann Savings Bank has been altered at least 2x since his commission. Here are a couple of placeholder “before” snapshots until I obtain better examples. Before (courtesy photos)/After example – Note changes like the Monell staircase design vs replacement and office additions vs open floor plan. The arch window motif remains.

architect Don Monell expansion for Cape Ann Savings Bank Gloucester Mass_ altered at least 2x since commission_20190524_© c ryan (2)

Signature elements – arches, contrast in materials, rectangles, winding paths

Monell was concerned with getting it right. You don’t have to know about Monell, his body of work or the history of architecture to be moved or respond. His slow designs are considerate of  their surroundings,  integrating connections with the natural and built environment. Thanks to his gentle, contemplative approach, it feels as though there’s more than enough space even when there isn’t much space to be had.

Gloucester Lyceum & Sawyer Free Public Library

When reviewing Monell’s body of work, it’s clear to see that Gloucester’s landscape, history, art and architecture inform his designs. The library’s connector and entrance are signature Monell motifs and beautiful. It’s no accident that the symmetry of the windows at the back of the building echo the five bays of the firestation,

or that they were inspired and reference City Hall, 1867.

Gloucester mass evolution of City Hall_Office of Mayor (2)

No matter which approach one takes to the library, Monell’s consideration of the building and its surroundings is intentional and graceful.

PANO_20170129Monell addition back and context surroundings_© c ryan.jpg

Special thanks to Alexander Monell for sharing his time, knowledge and inspiring family history. Photos are mine unless noted “courtesy”. Those are extra special as they were culled by Alexander Monell in loving tribute to his father and family that he kindly shared and even granted permission to publish here. More to come!

-Catherine Ryan, May 2019

Further reading

  • May 22, 2019 – Annual meeting – Library’s follow up with the Gloucester Daily Times, article by Ray Lamont
  • May 15, 2019 Questions remain unanswered yet trustees should vote today whether it’s a teardown reno or…  
  • Read more about philanthropist Samuel Sawyer here. Prudence Fish has written about the Saunders house and her book Antique Houses of Gloucester,2007, is a must read. Also see exhaustive 2005 Fitch report (link below)
  • 2017 – architectural renderings Oudens – see above, in this post, and architect’s website. Thus far is all that is available. For the past two years I have been told that the plans will be shared all in good time by architects, trustees, and library. I’ll link when they are. Some documents and updates used to be on the library website.
  • 2017- A House in the Sun by Daniel A. Barber “about solar house heating in American architecural, engineering, political and economic and coporate contests between WWII and the late 1950’s” references M.I.T. and Monell’s work. “Many houses and  heating systems were proposed or built by former students at MIT who had worked with Hottel and Anderson, including those designd by Lof in Colordo. One by Donald F. Monell in Gloucester, Massachusetts, for example, which remained unbuilt, proposed an “orange peel” collector that splayed the solar collection unit across an arc on the roof, and indicated some of the formal varieties of solar collection units that became available later in the decade. Monell also proposed to store the heated water in numerous smaller tanks according to the heating needs of different rooms.”- Barber
  • 2017 – Several round up posts on GMG- search library new building or recent re-post with links
  • 2005 – architectural plans Neshamkin, French Expansion Project – with preliminary suggestions to extend Monell’s architecture out back. There are several ways to approach the addition inspired by Monell* and Saunders. Monell’s handling of the two older structures,  front entrance and addition are important examples of his ouevre, not solely the “facade”, a dismissive term negating his work. At this time another generation of the Matz family was interested in assisting with this work. The beloved Matz Gallery is a hallmark of the current design.
2005 architectural plans show extending Monell architecture to the back
2005 – architectural plans Neshamkin, French Expansion Project – with preliminary suggestions to extend Monell’s architecture out back.
  • 2005 – outstanding Finch & Rose Saunders House Preservation report here
  • 2002 – links to Monell obituary, Gloucester Daily Time, Bowdoin, Boston Globe
  • 2001 – architectural plans Finegold, Alexander Expansion Project (here)
  • 1972 – architectural plans Monell  (I posted on GMG here) scroll to end of post
  • 1972 – architectural drawing Monell related to plans for Grant Circle Cape Ann Museum expansion, deferred till 2019 (see above)
  • Matz Gallery example- Mary Rhinelander McCarl solo exhibition 
Mary McCarl_Matz Gallery_20190109_ gallery at entrance to Sawyer Free Library ©c ryan
Mary Rhinelander McCarl exhibition, Matz Gallery, Sawyer Free

Sawyer Free proposed building in the news | annual meeting Monday

Sawyer Free exterior_20190517_© c ryan.jpg

Gloucester Daily Times article Sawyer Free trustees eye renovation by Ray Lamont here

Glouceser Lyceum & Sawyer Free Library 2019 Annual meeting Monday May 20 6-8PM

SFL annual meeting 2019 invite.jpg
SFL annual meeting 2019 (*note to SFL- please consider returning to Valerie Marino type posting days — with real people rather than clipart advert photos of children)

 

Prior post Febrary 4, 2019 with some questions

Besides the local new Cape Ann Museum build I’ve mentioned, here is a another recent comparable. Bowdoin’s new Roux Center for the Environment is approximately 30,000 ft’. The planning phase took 9 months. The build out took 14 months and the project cost less than 15 million (seeded with 10 million from the Rouxs). The Sawyer Free project is more than double that cost and the planning phase is many times past.

The community has been consistent about addressing the bathrooms for sometime. In 2014, the “immediate objectives will be working with the library’s board, staff and volunteers to review the library’s collections for relevance; revamping the building’s public and staff spaces; overseeing installation of a modern heating and air conditioning system, and mentoring staff in their professional development…”

Round up of new library building coverage prior to November 2018:

Prior post with 1973 brochure ed. Joe Garland

 

Questions for Sawyer Free Library building plans remain unanswered, yet trustees “should vote” TODAY whether it’s a teardown, reno, or …

library exterior from Dale.jpg

Public meetings –

Today Wednesday, May 15th, 2019

4PM 

The Gloucester Lyceum & Sawyer Free Public Library Building Committee will compare roughly estimated costs of one addition/renovation concept design for the Monell wing with the estimated costs of  a tear-down/new build of the Monell wing, after which the Board of Trustees “should vote” on their recommendation for which option to pursue. The plans are roughly the same as ones presented January 2017. Saunders is not a smidgen of this 21+ million quote. I’d link to any and all minutes and plans, but they have not been published on the library’s website (as they have been with other MBLC projects), distributed to the corporators (I am one),  nor released as hand outs and printed matter. I was told “when it’s the right time” by the architectural firm.

  1. tear down Monell / construct new building (nothing for Saunders)
  2. vs renovate Monell and build addition (nothing for Saunders)
  3. vs other

5:30PM 

Trustees “should vote” to accept the Building Committee’s recommendation based on roughly estimated costs

May 20th Annual Meeting

The annual meeting comes after today’s vote. “The Gloucester Lyceum and Sawyer Free Library annual meeting of the corporation will be Monday, May 20th, 6-8, Main Floor. The Reading (MA) Public Library Director will give the keynote address on Building Community, Building a Library followed by a presentation of the preferred concept design (voted today), closing with remarks of the president of the board on the future plans for the library.”

 

Architectural plans for the Cape Ann Museum curatorial center at White Ellery property by the Babson house

Signs of clearing for the exciting Cape Ann Museum addition for a curatorial center on the White-Ellery property January 2019 Gloucester, Massachusetts

Enjoy comparing plans and photos plus a link to a higher resolution PDF of new groundscape single page from the architectural plans

cape ann museum curatorial archives center white ellery campus

 

babson house next to white ellery barn and new cape ann museum curatorial and archives center_20190127_© catherine ryan

behind and around babson clearing for cape ann museum_ new fence_20190127_© catherine ryan

today new fence and visibility (above) vs google (below) old fence & more overgrowth…there is forsythia along there

google still showing old fence and overgrowth.jpg

cape ann museum clearing for archive curatorial center _20190127_© catherine ryan
from Poplar (Babson straight back, White Ellery and Barn to the right)
from poplar side_gravel access_new sewer_cape ann museum_20190127_© catherine ryan
Poplar (gravel access)

Coastal beauty: Gloucester Lyceum & Sawyer Free Public Library

Gloucester’s enchanting open spaces  – Sawyer Free library’s John and Dorothy Rando Memorial Garden at the front and side entrances

Sawyer Free_beautiful massachusetts public library _Gloucester MA_open space natural garden and ampitheater _20180530_105058.jpg

 

 

looking to City Hall from Sawyer Free _May flowers spring 2018_©c ryan

Fitz Henry Lane and other art removed from the library building (January 2018):

https://goodmorninggloucester.wordpress.com/2018/01/03/down-the-lane-fitz-henry-lane-art-shuffled-from-gloucester-sawyer-free-library-to-cape-ann-museum/

Proposed building plans 2017 includes 1972 quest for what became lovely Monnell building:

https://goodmorninggloucester.wordpress.com/2017/01/03/no-finer-place-for-sure-downtown-proposed-building-plans-sawyer-free-library-city-hall-whoa-in-the-news-plus-the-1973-appeal-led-by-joseph-garland-universal-access-and-archives/