Quite a DPW project! heavy equipment brought in for Long Beach seawall repairs

heavy equipment_Long Beach_ Cape Ann Motor Inn_walkway winter 2019 repairs on beach side_20190208_Gloucester Rockport Mass© Catherine Ryan a

Dog walkers and surfers crossed paths with Kevin and Gary from K & R Construction and Rockport Department of Public Works (DPW) on site setting up a new phase for Long Beach seawall repairs. Two roughly 500 feet lengths of rip rap extending out 15-18 feet (tapered) will be built up beginning just past the first stairs near red cottage 20 Long Beach. Sand will be added later as part of this phase. A steel road plate path was set in at the Gloucester Mass staging entrance so equipment won’t get stuck. Last year smaller forklifts and dump trucks shuttled boulders for patch rip rap.

 

Slow and steady– truck is LOADED (and another sets up straight away)

 

sweet ducklings navigate the current at the Cut alongside Gloucester DPW lovely storm repairs

It has been a long time since I’ve brought a tiny boat through the Cut from the Annisquam side (alert and praying I wouldn’t slam into the walls or another boat as the waters rush and pull).Ā  How were ducks faring? They wereĀ  amusing and difficult to count for a few stolen moments on this glorious summer day.Ā They’d dive to eat what I’m not sure, and pop up, sometimes a bit too far back. Once they were under so long I found myself crossing to the other side of the bridge to see if they were dragged back or catching a ride. Not a chance.

I found the completed winter storm repairs at the Cut equally beautiful and distracting.

Nice job Gloucester Department of Public Works (DPW)!

DPW completes winter storm repairs at Blynman The Cut _Department of Public Works _Gloucester MA _20180713_photo Ā© c ryan (2)

VID (38 seconds) ducklings negotiate current at the Cut (wait for the cluster to pop up)

 

 

July 13 2018 – Gloucester Department of Public Works has completed winter storm repairsĀ 

 

 

March 2017 (winter storm damage) Continue reading “sweet ducklings navigate the current at the Cut alongside Gloucester DPW lovely storm repairs”