Visitors from Texas

DSC03013

A delightful couple from The Colony Texas, we talked about Gloucester and it’s history. We  also talked about our beards, he has had his for the past eighteen years.

Stacy Boulevard Part 7: expanded garden plans Tulip Fest May 6, 2017

IMG_20170504_052040

photos: © Catherine Ryan

Saturday May 6, 2017 is the official ribbon cutting re-opening of Stacy Boulevard by Mayor Romeo Theken. Thanks to the Mayor, Mike Hale and all Gloucester DPW, GZA, Essex County Landscape Assoc, Gloucester Community Preservation Act, Ann Giraldi Johnson, GFWA, Lieutenant Governor Karyn Polito, and groups like the Seaport Economic Council and Dir Carolyn Kirk, Department of Conservation and Recreation (DCR), Joe Lucido, Ed Parks, Mike Linquata, Donna Ardizzoni and One Hour at a Time Gang, Ringo Tarr, Bobbie Turner, YMCA and summer help, Wolf Hill, Generous Gardeners, and other volunteers!

Tulip Festival and bonnet parade Saturday 10AM

Ribbon Cutting 11:30AM

Party at Mile Marker Restaurant 6-10PM

Enjoy a closer look at the engineering and landscape plans for the expanded gardens and before/after comparisons.

IMG_20170410_103217 (1)

Stacy expanded gardens

IMG_20170503_151327 

Before April 2017 | After May 2017

IMG_20170504_052906
IMG_20170504_052211
IMG_20170504_051437

IMG_20170504_053712Funding for future perennials funded in part by the Gloucester Community Preservation Act

IMG_20170419_092846

CPA grant towards new gardens summary of design and details

CPA funding

Series:

Great poster with timeline and facts about the Stacy Boulevard Flag Display

Thanks to Ringo Tarr, Pauline Bresnahan, Cape Ann Veterans

blvd poster 2

Stacy Boulevard construction Part 5: rounded a big corner and an angle of repose

 

IMG_20161202_101325

 

INVISIBLE DETAILS UNDERFOOT AND RIGHT THERE

Earlier posts outline the engineering. The photograph above details the subgrade that was re-established for irrigation (note ditch alongside walkway), loam and sod. The photo also emphasizes the lengthy short wall on the right which was removed for access during construction. “The excavation was deep enough that the angle of repose was into the old wall.” The wall in the photo is rebuilt.

 

00001IMG_00001_BURST20161202101306_COVER

 

MEMORIAL BENCHES

Spacing and symmetry were important design considerations for Stacy Boulevard construction. The old benches were surveyed. Most were returned relative to where they were sited before the build out. The memorial benches on the boulevard are full. This one shows a tribute to Al Swelka.

 

IMG_20161202_094543

 

IMG_20161228_110253

00000IMG_00000_BURST20161202094911_COVER

Photos Nov-Dec 2016. Video caption: Stacy Boulevard construction minute – stroll before January, and sod.  Upcoming posts in this Stacy Boulevard series include: disasters, the cultural landscape, and Blynman. 

Series:

Part 4 – Gloucester’s majestic public works construction stats: bringing the Stacy Boulevard plans to life 

Part 3- Gloucester’s Stacy boulevard public works construction Part 3: compare high res plans from 1922 and 1923 with today

Part 2: Stacy Boulevard Public Works stunner | Gloucester is an early client for the Harvard and Olmsted trained landscape designer, Thomas Warren Sears. His 1908 photos are a must see!

STACY BOULEVARD NEARING THE FINISH LINE Part 1 – 

September 12 2016- Stacy Boulevard construction update: historic Blynman the Cut Bridge project scope plans and engineering details

August 2016