Fog over Gloucester Harbor

While walking Stacy Boulevard on Monday watching the fog roll in and out was so pretty.  You could see the fog lifting over Magnolia and East Gloucester.

sweet ducklings navigate the current at the Cut alongside Gloucester DPW lovely storm repairs

It has been a long time since I’ve brought a tiny boat through the Cut from the Annisquam side (alert and praying I wouldn’t slam into the walls or another boat as the waters rush and pull).  How were ducks faring? They were  amusing and difficult to count for a few stolen moments on this glorious summer day. They’d dive to eat what I’m not sure, and pop up, sometimes a bit too far back. Once they were under so long I found myself crossing to the other side of the bridge to see if they were dragged back or catching a ride. Not a chance.

I found the completed winter storm repairs at the Cut equally beautiful and distracting.

Nice job Gloucester Department of Public Works (DPW)!

DPW completes winter storm repairs at Blynman The Cut _Department of Public Works _Gloucester MA _20180713_photo © c ryan (2)

VID (38 seconds) ducklings negotiate current at the Cut (wait for the cluster to pop up)

 

 

July 13 2018 – Gloucester Department of Public Works has completed winter storm repairs 

 

 

March 2017 (winter storm damage) Continue reading “sweet ducklings navigate the current at the Cut alongside Gloucester DPW lovely storm repairs”

BOCCE on Stacy Boulevard

Spectators watch coaches and players practice for the Eastern Mass Bocce Regional Qualifying Tournament in Marlboro Ma

DSC09674