Level by level. New England Scaffolding says the ETA for the removal of the critical scaffolding set up for the storm damage repair to Gloucester’s Our Lady of Good Voyage landmark will happen by Monday, and for sure by Christmas.
Images: Dec. 16, 2023. Scaffolding set up in August of 2023 is coming down. Beautiful and lofty work complete!
Images: 2021. Looking back Before repairs – storm damage
Spread The GMG Love By Sharing With These Buttons:
Brick cladding exterior renovation underway on a ‘for sale’ commercial building spanning Main Street to Rogers, 21 Main Street, with tenants Mystery Train and St. Peter’s Club. Before and In Progress photos below.
photos: prior decorative pattern on facade (festive St. Peter tiling below with yellow tile above)
Prep in process – October 2021
Multi story major building prep foreshadowed extra weight
Underway – November 2021
Note the architectural details developing like the decorative pattern emphasized by quoins (pronounced “coins”) toothed (staggered), lighter in color, and running 2/3 the full height (at this point) where the building edges meet.
Beautiful how one can see City hall from St. Peter’s sq.
Stay tuned for the After photos.
Spread The GMG Love By Sharing With These Buttons: