East Gloucester Marine Construction Update 4/26/08, originally uploaded by captjoe06.
Looks like they are tying the deck into the mainland with rebar. Close to being done on this advanced engineered pier. The people that poured the concrete told Manuel who is a dock manager there that he has never poured concrete on a pier engineered to such high standards.
