The Proposal Set Transformation

The Proposal Set Transformation, originally uploaded by captjoe06.

A close up of the work being done to Pier 7 to transform it to “The Trawler” for the movie “The Proposal”.

Pier 7 Transformation for Sandra Bullock Movie

This is a closer work of the work being done to transform Pier 7 into the movie set for the upcoming Sandra Bullock/Ryan reynolds movie that will be shooting scenes there.

Pier 7/ Enos Marine 2/22/08

Pier 7/ Enos Marine, originally uploaded by captjoe06.

Here is a pic of Pier 7/Enos Marine taken on Feburary 22.

Notice the boarded up windows and filled in deck on the second floor as it compares to the transformation being done for the movie set..

Pier 7 Transformation for Sandra Bullock Movie

Currently there are guys working at Pier 7 to transform Pier 7 into a movie set for the Sandra Bullock movie that is taping around town.

In this picture workers are painting the deck.

If you notice the windows have been boarded up and shingled with paint.

Damon 7:00AM 4/19/08

Damon 7:00AM 4/19/08, originally uploaded by captjoe06.

Happened to catch our boy just as he was rounding the dock this morning.

Mornin’ kid.

Moon Sets Over The Maritime Heritage Center 4/19/08

East Gloucester Marine Construction Update 4/18/08

First there was the concrete filled steel pilings which support the huge cement and rebar frame.

Then the pre-poured panels were set in place which locked into place on top of that frame. Now another layer or cement reinforced with rebar is being laid over all of that which will tie the whole thing together.

I swear you could support an aircraft carrier on this deck.

Great job.

East Gloucester Marine Construction Update 4/18/08