Back On March 30th I posted the Over Under Poll For Completion Of The Good Harbor Beach Footbridge Poll-Here Were The Results

 

On March 30th I pegged the over under in the podcast we taped that day with Paul Morrison and Paulie Walnuts as the Third Saturday In May and I took the under based on the City wanting to have it open in time for Memorial Day Weekend-

GMG Discussion With Host Joey C, Paul Frontiero and Paul Morrison

Posted on March 30, 2013 by Joey C

image

Most took the over.  Coming Down To The Wire.

See Manny, David Cox and Kim Smith’s Posts-

Foot Bridge Repair – Day Five

Posted on May 10, 2013 by Manuel F. Simoes

Good harbor footbridge

Posted on May 10, 2013 by David B. Cox

Foot Bridge Repairs – Day Four

Posted on May 9, 2013 by Manuel F. Simoes

Good Harbor Beach Footbridge Almost Ready for Fun!

Posted on May 9, 2013 by Kim Smith

and Charlie Carroll’s Photo-

The-Bridge

photoshop city baby

Foot Bridge Repair – Day Five

Amazing how much was accomplished in just Five days.  There is still more work to be done, such as replace the iron railings in the center structure, and secure some more of the under carriage. 

My thanks to the DPW work crew that put up with me for the past week, taking photos and just getting in their way.

IMG_1413IMG_1372IMG_1373IMG_1377IMG_1381

Foot Bridge Repairs – Day Four

More work being performed on the under carriage, replacing many old boards, and repalce more than expected railings. 

Inspecting scheduled, for later this week, and public access set for sometime next week.  

Also see Kim’s post on same subject.

IMG_1360IMG_1336