![DSC_1617 [640x480] DSC_1617 [640x480]](https://goodmorninggloucester.com/wp-content/uploads/2009/07/dsc_1617-640x480.jpg?w=700)
It was time to hoist the sails and everyone onboard was needed to raise the heavy canvas sails. The crew taught us how to work as a group in this incredible task. Hand over hand, we used every muscle – arms, legs, back.
Some of the terms we learned:
halyard-line used for hoisting sails.
hoist-the length of the luff of a fore-and-aft sail
luff-to get so close to the wind that the sail flaps; also the forward edge of a sail
mainsail-boomed sail projecting aft from the mainmast
mainsheet- line that controls the main boom.
ARRRRRRGGGGGHHHH!– Whenever commands weren’t followed! Mostly heard from JP when he was in charge.

And no gloves! My soft IT worker hands would have needed some me thinks
LikeLike