Cruiseport Construction Update 5/16/08

Looks like the first floor is framed up and the plywood is on.  Not much in the way of windows which leads me to believe that it will be LNG storage (not positive about that though)

image_1, originally uploaded by captjoe06.

Leaving a comment rewards the author of this post- add to the discussion here-