First Pictures StateSide – Wind Turbine in Boston
Turbine blades ready to be offloaded onto 270 foot long Barge Chem Caribe.
Blade lifted and moving over the to the Barge Chem Caribe. Notice the unique cradle.
Second blade is lowered onto Barge Chem Caribe next to another 160 foot long blade.
On Monday, October 15th, the Tug Orion will deliver the wind turbine to Gloucester. Get ready for Height Shock in November.

