
Here is the complete MassDOT public form regarding the Blyman Bridge project in a 90 minute forum made available by MassDOT.
Subject: RE: 608397 Gloucester β Bridge replacement, Route 127 (Western Avenue) over Blynman Canal PIM Confirmation. Recording has been posted.
Gloucester β Bridge replacement, Route 127 (Western Avenue) over Blynman Canal | Mass.gov
This recording includes MassDOT personnel, the architects involved with all options and designs that were considered. Plus, it depicts the interim temporary road and lift bridge during construction.
-Bill Funk
